Temple Quay, Plot 3 Infrastructure Works
Homes & Communities Agency Complete Contract award
- Buyer
- Homes & Communities Agency
- Estimated value
- £1,300,000 as published; Contracts Finder does not say whether VAT is included
- Awarded value
- £1,158,644 as published, VAT not stated
- Category
- Works
- CPV code
45200000Works for complete or part construction and civil engineering work- First published
- 15 Jan 2016
- Last updated
- 15 Jan 2016
- Rules
- Before the Procurement Act 2023: the Public Contracts Regulations 2015 and earlier rules, or below their thresholds
Description
The Plot 3 Infrastructure works around Temple Quay being approximately 3,000m2 of pavement construction, generally comprise of stone capping with tarmac sub-base, sand and block paving, and associated works will include the following components:
• Earthworks
• Extension of Friary to Meads Reach Bridge
o This work would comprise the extension of Friary as a two carriageway road east of Isambard Walk to Meads Reach Bridge.
o As part of this work the footway to the north of Friary (adjacent to the Plot 3 development site) would be extended to 6 metres in width, as will the footway to the south (adjacent to the station) would be made 8.5 metres in width and include the provision of 6 new benches and an avenue of 5 new trees.
o The Friary will terminate with the provision of a new flexible use open space
• Flexible Open Space
o Space for temporary use will also be provided between the extended Friary and the listed retaining wall (outside of development area)
o The area will be finished with seating terraces, and a planted bank to tie into the existing levels forming an earth retaining structure.
o This area will also need to be made capable of accommodating the occasional vehicle turning.
• Opening Isambard Walk as a two-way vehicular street between Friary and Temple Back East
o The existing pedestrianised Isambard Walk will be opened for two-way vehicle access to create a link between Temple Back East and Friary, and to tie in with the existing road of the private estate. As part of this work a new footway will also be provided to the eastern side of the Isambard Walk new carriageway.
o Isambard Walk will act as a shared space, and so will be treated to reduce the potential dominance of vehicles and reduce vehicle speeds
o The footway, trees, cycle parking and street furniture to the west of Isambard Walk and in The Square would remain as existing.
• Temple Back East
o The existing turning head area on Temple Back East would be removed, to allow two way vehicular access to Isambard Walk
o Two way vehicular access will be maintained to Rope Walk, with a left turn out of Rope Walk into Isambard Walk to be provided for
o Existing crossing will be maintained across from The Square to the footway on Temple Back East
Awards
| Supplier | Value | Date | Status |
|---|---|---|---|
| Dyer and Butler | £1,158,644 | 17 Mar 2016 | Active |
Notices
- 15 Jan 2016 Contract award