# Temple Quay, Plot 3 Infrastructure Works

Homes & Communities Agency · Complete · Contract award

- Buyer: Homes & Communities Agency
- Estimated value: £1,300,000 (VAT not stated)
- Awarded value: £1,158,644 (VAT not stated)
- Category: Works
- CPV code: 45200000 Works for complete or part construction and civil engineering work
- First published: 15 January 2016
- Last updated: 15 January 2016
- Rules: before the Procurement Act 2023 (published on Contracts Finder)

## Description

The Plot 3 Infrastructure works around Temple Quay being approximately 3,000m2 of pavement construction,  generally comprise of stone capping with tarmac sub-base, sand and block paving, and associated works will include the following components:

•	Earthworks 
•	Extension of Friary to Meads Reach Bridge
o	This work would comprise the extension of Friary as a two carriageway road east of Isambard Walk to Meads Reach Bridge. 
o	As part of this work the footway to the north of Friary (adjacent to the Plot 3 development site) would be extended to 6 metres in width, as will the footway to the south (adjacent to the station) would be made 8.5 metres in width and include the provision of 6 new benches and an avenue of 5 new trees.
o	The Friary will terminate with the provision of a new flexible use open space

•	Flexible Open Space
o	Space for temporary use will also be provided between the extended Friary and the listed retaining wall (outside of development area) 
o	The area will be finished with seating terraces, and a planted bank to tie into the existing levels forming an earth retaining structure. 
o	This area will also need to be made capable of accommodating the occasional vehicle turning. 

•	Opening Isambard Walk as a two-way vehicular street between Friary and Temple Back East
o	The existing pedestrianised Isambard Walk will be opened for two-way vehicle access to create a link between Temple Back East and Friary, and to tie in with the existing road of the private estate. As part of this work a new footway will also be provided to the eastern side of the Isambard Walk new carriageway.
o	Isambard Walk will act as a shared space, and so will be treated to reduce the potential dominance of vehicles and reduce vehicle speeds
o	The footway, trees, cycle parking and street furniture to the west of Isambard Walk and in The Square would remain as existing. 

•	Temple Back East
o	The existing turning head area on Temple Back East would be removed, to allow two way vehicular access to Isambard Walk
o	Two way vehicular access will be maintained to Rope Walk, with a left turn out of Rope Walk into Isambard Walk to be provided for
o	Existing crossing will be maintained across from The Square to the footway on Temple Back East

## Awards

| Supplier | Value | Date | Status |
|---|---:|---|---|
| Dyer and Butler | £1,158,644 | 17 Mar 2016 | Active |

## Notices

- 15 Jan 2016: Contract award https://www.contractsfinder.service.gov.uk/Notice/caa314b4-af26-4c65-9cca-92ed59a10ca9

---