Site Steam Upgrade Project - Principal Contractor & Installation Package
The Pirbright Institute Cancelled Procurement termination notice
- Buyer
- The Pirbright Institute
- Estimated value
- £320,000 excluding VAT; £384,000 including VAT
- Procedure
- Below threshold - open competition
- Category
- Works
- CPV code
42160000Boiler installations- First published
- 17 Oct 2025
- Last updated
- 7 Jan 2026
- Legal basis
- Procurement Act 2023
Description
The purpose of this project is to increase the Institute’s sustainability (both environmental & financial), reduce carbon emissions and safeguard the steam supply to all buildings utilising steam generated at Pirbright.
This will be achieved by a combination of the following three factors:
• New steam main & condensate recovery system to steam users currently served by the end of life Western Boiler House.
• Removal of inefficient and end of life Western Boiler house & increasing load on the currently underutilised, efficient, EC1 steam generation plant by 450kWh (585 kg/hr).
• Upgrading 2 of 4 EC1 steam boilers with burners capable of 10:1 turndown ratio to enable more efficient operation at low production rates during summer months.
Contract Scope
The contract is for a single supplier to act as the Principal Contractor and complete all works as follows:
• Supporting the Stage 4 design with client nominated designer and Project Manager
• Supply and Installation of EC1 steam boiler burners (x2).
• Steam connection & packaged steam – LTHW interface to Engineering workshop
• Enabling works for new steam & condensate return connections located on EC1 steam distribution and WBH.
• Supply and installation of steam and condensate equipment.
• Facilitate installation & commissioning of EC1 boiler burner replacements.
• Supply and installation of new steam connection & condensate return including all required equipment.
• Deliver a phased changeover of steam delivery from the WBH to the newly installed connection fed from EC1.
• Decommission, removal and disposal of WBH and associated redundant equipment.
• Disconnection and isolation of gas, compressed air and mains water.
• Commissioning and handover including Project Information Folder (PIF) is provided to the client Project Manager.
Awards
| Supplier | Value | Date | Status |
|---|---|---|---|
| Not named | - | 7 Jan 2026 | Cancelled |
Notices
- 17 Oct 2025 Tender notice 066245-2025
- 7 Jan 2026 Procurement termination notice 001102-2026
Find a Tender holds the official notices, with their documents and contact details.