OpenContracts

Shaft Secondary Lining Jumpform System

CVB JV - Costain, Vinci C G P, Bachy Soletanche Active Tender notice

Buyer
CVB JV - Costain, Vinci C G P, Bachy Soletanche
Estimated value
£2,500,000 as published; Contracts Finder does not say whether VAT is included
Category
Services
CPV code
45200000 Works for complete or part construction and civil engineering work
First published
19 Nov 2018
Last updated
19 Nov 2018
Rules
Before the Procurement Act 2023: the Public Contracts Regulations 2015 and earlier rules, or below their thresholds

Description

CVBJV is the main contractor for the East section of the Thames Tideway project.
There are 5 site in total and 4 sites are being done with a jump form system. The Sites address
are:
GREPS
Thames Water Pumping Station
101 Greenwich High Road
LONDON SE10 8JL
DEPCS
Deptford Work Site
Crossfield Street
LONDON SE8 3PH
EARPS
Earl pumping station
Yeoman street
LONDON SE8 5ET
KEMPF
Glamis Road
St Katharine and Wapping
LONDON E1W 3TD
The 4 shafts are drop shafts between the existing sewers on surface and the tunnels
of the new Thames Tideway project. Therefore, they all have a vortex structure, a vortex
generator, and a connection to an interception chamber. Sections and elevations are available
further in this document in Appendix A.
The lower part of the shaft where the tunnels connect will be already built at the time
of the construction. The jumpform system will therefore be used for the construction of the
middle and top part of the shaft.
The supplier will provide a jump form system (called shutter hereafter) to cast the
secondary lining for the 4 construction site's shafts. The formwork for the lower section where
the tunnels connect will be part of a different brief.
The shutter will be a single face arrangement*, suitable to pour 3m lifts, which will allow
the pour of the vortex, and fitted with 3 levels of platforms as described in the section 3.2
Shutter Arrangement.
The shutter will be adaptable to the different diameter of the shafts and the different
dimensions of the vortex.
The shutter will be able to cope with the different sequence of pour of the vortex
generator.
The supply will include:
- The full design, with optional CAT 3 design check, in accordance with the deliverable
in the section 4.2 below.
- All the hydraulic system required for the "jumping" operation. A solution "pulled" from
the top of the shaft, with a strand jack system can be proposed.
- All the guiding system to control and maintain the shutter within the required 25mm
tolerance. Manpower will need to be supplied to supervise the jumping operation, and
the checking of tolerances.
- The design and supply of all the embedded items needed to support the shutter. These
items will have to meet the requirement of the permanent work repair procedure.
- All access within the shutter itself, and working platforms
- All access ladders and access hatches
- All the edge protection including the net/tarpaulin/etc to block the view and/or maintain
a closed environment
- The adapted amount of supervision for the assembly and dismantling of the shutter.
- Spare parts stored on site for the most common failures

Notices

  1. 19 Nov 2018 Tender notice

Contracts Finder holds the official notices, with their documents and contact details.

Data