OpenContracts

HMP Bedford Fire Safety Improvements (RETENDER) - BPRN 508/16/1123

Ministry of Justice Complete Contract award

Buyer
Ministry of Justice
Estimated value
£1,383,894 as published; Contracts Finder does not say whether VAT is included
Awarded value
£1,383,894 as published, VAT not stated
Procedure
Call-off from a framework agreement
Category
Works
CPV code
45216113 Prison building construction work
First published
10 Feb 2025
Last updated
10 Feb 2025
Rules
Before the Procurement Act 2023: the Public Contracts Regulations 2015 and earlier rules, or below their thresholds

Description

- Total replacement of the current Fire Safety systems within the built environment (ie site wide) , utilising hard wired system.
- Furthermore, the integration of a number of sustainability initiatives including; replacement of LED lighting, introduction of lighting controls and water saving initiatives.

A constructor has been appointed for the design and build of the project.
This is a two stage Design and Build Contract let under the PPC2000 (Amended 2013) Form of contract.
The original estimated value of the contract was calculated by MOJ, and its Cost Consultants following desktop and non-intrusive surveys and was based on information reasonably known at the time and arrived at via a thorough and appropriate methodology.
The first stage will involve the constructor providing Pre-construction surveys and design services at a cost of £1,383,894. It is expected that the total construction cost of the project will be c£14m.

Awards

SupplierValueDateStatus
Kier Construction Ltd £1,383,894 3 Feb 2025 Active

Notices

  1. 10 Feb 2025 Contract award

Contracts Finder holds the official notices, with their documents and contact details.

Data