HMP Bedford Fire Safety Improvements (RETENDER) - BPRN 508/16/1123
Ministry of Justice Complete Contract award
- Buyer
- Ministry of Justice
- Estimated value
- £1,383,894 as published; Contracts Finder does not say whether VAT is included
- Awarded value
- £1,383,894 as published, VAT not stated
- Procedure
- Call-off from a framework agreement
- Category
- Works
- CPV code
45216113Prison building construction work- First published
- 10 Feb 2025
- Last updated
- 10 Feb 2025
- Rules
- Before the Procurement Act 2023: the Public Contracts Regulations 2015 and earlier rules, or below their thresholds
Description
- Total replacement of the current Fire Safety systems within the built environment (ie site wide) , utilising hard wired system.
- Furthermore, the integration of a number of sustainability initiatives including; replacement of LED lighting, introduction of lighting controls and water saving initiatives.
A constructor has been appointed for the design and build of the project.
This is a two stage Design and Build Contract let under the PPC2000 (Amended 2013) Form of contract.
The original estimated value of the contract was calculated by MOJ, and its Cost Consultants following desktop and non-intrusive surveys and was based on information reasonably known at the time and arrived at via a thorough and appropriate methodology.
The first stage will involve the constructor providing Pre-construction surveys and design services at a cost of £1,383,894. It is expected that the total construction cost of the project will be c£14m.
Awards
| Supplier | Value | Date | Status |
|---|---|---|---|
| Kier Construction Ltd | £1,383,894 | 3 Feb 2025 | Active |
Notices
- 10 Feb 2025 Contract award
Contracts Finder holds the official notices, with their documents and contact details.