# HMP Bedford Fire Safety Improvements (RETENDER) - BPRN 508/16/1123

Ministry of Justice · Complete · Contract award

- Buyer: Ministry of Justice
- Estimated value: £1,383,894 (VAT not stated)
- Awarded value: £1,383,894 (VAT not stated)
- Procedure: Call-off from a framework agreement
- Category: Works
- CPV code: 45216113 Prison building construction work
- First published: 10 February 2025
- Last updated: 10 February 2025
- Rules: before the Procurement Act 2023 (published on Contracts Finder)

## Description

-	Total replacement of the current Fire Safety systems within the built environment (ie site wide) , utilising hard wired system. 
-	Furthermore, the integration of a number of sustainability initiatives including; replacement of LED lighting, introduction of lighting controls and water saving initiatives.

A constructor has been appointed for the design and build of the project.
This is a two stage Design and Build Contract let under the PPC2000 (Amended 2013) Form of contract.
The original estimated value of the contract was calculated by MOJ, and its Cost Consultants following desktop and non-intrusive surveys and was based on information reasonably known at the time and arrived at via a thorough and appropriate methodology. 
The first stage will involve the constructor providing Pre-construction surveys and design services at a cost of £1,383,894. It is expected that the total construction cost of the project will be c£14m.

## Awards

| Supplier | Value | Date | Status |
|---|---:|---|---|
| Kier Construction Ltd | £1,383,894 | 3 Feb 2025 | Active |

## Notices

- 10 Feb 2025: Contract award https://www.contractsfinder.service.gov.uk/Notice/65da7402-ff03-4716-8d1e-5e6b6bff2595

---