Castleford to Wakefield Greenway Cycleway Bridge Over Live Railway.
Wakefield Council Customer Service Complete Contract award
- Buyer
- Wakefield Council Customer Service
- Estimated value
- £850,000 as published; Contracts Finder does not say whether VAT is included
- Awarded value
- £420,850 as published, VAT not stated
- Procedure
- Open procedure (above threshold)
- Category
- Works
- CPV code
45200000Works for complete or part construction and civil engineering work- First published
- 6 Jul 2017
- Last updated
- 5 Dec 2017
- Rules
- Before the Procurement Act 2023: the Public Contracts Regulations 2015 and earlier rules, or below their thresholds
Description
As a part of the Castleford to Wakefield Greenway scheme a cycleway bridge is required to cross the existing railway. The crossing position is at the position of an existing bridge which has since been removed. Abutments remain but these are not to be utilised in the design, though the effect of their possible removal must be considered by the designer.
The feasibility report has recommended a 35m span steel bridge on abutments independent and not reliant on the existing abutments.
The contractor is to design and build a 35m span steel cycleway bridge in accordance with the current Design Manual for Roads and Bridges and the Manual of Contract Documents for Highway Works as published by DfT. The design must also include for all requirements of Network Rail in crossing their infrastructure.
The works comprise:
DESIGN STAGE
Ground investigation - scope
Topographical Survey
Environmental Surveys, Statement and Mitigation.
Input to Safety Audits all Stages
C3 and C4 notices and estimates
Liaison with Wakefield Council and outside bodies
Liaison with Network Rail
Network Rail Procedures
Detailed design of the rail bridge including AIP and Category 3 Check.
Signal Sighting Report
Progress meeting attendance
Programme preparation and monthly updates.
Dealing with all technical queries during construction
Network Rail Liaison Design/Query Procedures during Construction.
Construction Phase
1 Construction of the designed bridge.
2 Construction of approximately 400m of 3m wide cycleway on the remains of a dismantled railway and across the new bridge. This cycleway will tie in to the existing cycleways constructed by others.
Additional information: All documents available from Yortender Web Portal www.yortender.co.uk ref number DN280473
Awards
| Supplier | Value | Date | Status |
|---|---|---|---|
| Amalgamated Construction Limited | £420,850 | 5 Dec 2017 | Active |
Notices
- 6 Jul 2017 Tender notice
- 5 Dec 2017 Contract award