# Castleford to Wakefield Greenway Cycleway Bridge Over Live Railway.

Wakefield Council Customer Service · Complete · Contract award

- Buyer: Wakefield Council Customer Service
- Estimated value: £850,000 (VAT not stated)
- Awarded value: £420,850 (VAT not stated)
- Procedure: Open procedure (above threshold)
- Category: Works
- CPV code: 45200000 Works for complete or part construction and civil engineering work
- First published: 6 July 2017
- Last updated: 5 December 2017
- Rules: before the Procurement Act 2023 (published on Contracts Finder)

## Description

As a part of the Castleford to Wakefield Greenway scheme a cycleway bridge is required to cross the existing railway.  The crossing position is at the position of an existing bridge which has since been removed.  Abutments remain but these are not to be utilised in the design, though the effect of their possible removal must be considered by the designer.

The feasibility report has recommended a 35m span steel bridge on abutments independent and not reliant on the existing abutments.

The contractor is to design and build a 35m span steel cycleway bridge in accordance with the current Design Manual for Roads and Bridges and the Manual of Contract Documents for Highway Works as published by DfT. The design must also include for all requirements of Network Rail in crossing their infrastructure.

The works comprise: 

DESIGN STAGE

Ground investigation - scope 

Topographical Survey

Environmental Surveys, Statement and Mitigation.

Input to Safety Audits all Stages

C3 and C4 notices and estimates

Liaison with Wakefield Council and outside bodies

Liaison with Network Rail

Network Rail Procedures

Detailed design of the rail bridge including AIP and Category 3 Check.

Signal Sighting Report

Progress meeting attendance

Programme preparation and monthly updates.

Dealing with all technical queries during construction

Network Rail Liaison Design/Query Procedures during Construction.

Construction Phase

1 Construction of the designed bridge.

2 Construction of approximately 400m of 3m wide cycleway on the remains of a dismantled railway and across the new bridge. This cycleway will tie in to the existing cycleways constructed by others.

Additional information: All documents available from Yortender Web Portal www.yortender.co.uk ref number DN280473

## Awards

| Supplier | Value | Date | Status |
|---|---:|---|---|
| Amalgamated Construction Limited | £420,850 | 5 Dec 2017 | Active |

## Notices

- 6 Jul 2017: Tender notice https://www.contractsfinder.service.gov.uk/Notice/0beee2a7-78c5-4ad0-aa0f-0519eabaef1b
- 5 Dec 2017: Contract award https://www.contractsfinder.service.gov.uk/Notice/2c9d7f68-afbb-4b44-99c3-19c784400620

---
Page: https://opencontracts.uk/contract/castleford-to-wakefield-greenway-cycleway-bridge-over-live-rail-cbc06de8-436a-48ac-b852-24f5bdf48dce
Contains public sector information licensed under the Open Government Licence v3.0. Source: Find a Tender and Contracts Finder, Cabinet Office.