# WP15.04 IEP Access and Retaining Wall - Old Oak Common (S4) Station

Balfour Beatty VINCI Systra JV · Active · Tender notice

- Buyer: Balfour Beatty VINCI Systra JV
- Estimated value: £5,000,000 (VAT not stated)
- Category: Works
- CPV code: 44212400 Piling
- First published: 10 April 2025
- Last updated: 10 April 2025
- Rules: before the Procurement Act 2023 (published on Contracts Finder)

## Description

WP 15.04 IEP Access and Retaining wall
      
      Scope
      The scope consists of two key components:
      A new/altered access route at the west end of the Hitachi IEP Depot to facilitate construction works for the wider project.
      A new retaining wall structure to retain the IEP Depot infrastructure whilst also forming the eastern boundary of the new Old Oak Common Lane alignment.
       
      The following will be required:
      Detailed design, supply and installation of the above scope.
      Fully coordinated design with the existing and new Old Oak Common Lane alignments, Part 2/3 bridge structure, utilities through Old Oak Common Lane and the GWML UTX tunnels.
      Provide RIBA 5 design and construction drawings including setting out detailing, general arrangements, and elevation drawings for construction.
      Provide samples and construct a mock up in accordance with the Old Oak Common Lane Schedule 17 architectural requirements
      IEP Depot Access Route (Stage 2) - the ramp
      The existing access route in the southwest corner of the Hitachi IEP Depot needs adapting to suit Old Oak Common (BBVS and SRSA) construction traffic requirements.
      IEP Depot Retaining Wall 
      Construction of a new bored piled retaining wall supporting the embankment to the south west corner of the IEP Depot.
      Piling, plunge columns, concrete planks, masonry finish, backfilling, RC concrete
      Could separate our piling/plunge columns from other works
      Piling could be incorporated into the highways scope
       
      Utility diversions to enable works above
      Several existing utilities running through the IEP Depot will need to be diverted or managed before major civils and excavation works can commence. These include:
      Foul sewer
      Multiple LV electricity supplies
      Telecoms

## Notices

- 10 Apr 2025: Tender notice https://www.contractsfinder.service.gov.uk/Notice/e7f64e8b-2281-4640-aa83-3b5e885bae83

---
Page: https://opencontracts.uk/contract/wp1504-iep-access-and-retaining-wall-old-oak-common-s4-station-643c661c-fe88-4721-aa3f-db155eb6c6e6
Contains public sector information licensed under the Open Government Licence v3.0. Source: Find a Tender and Contracts Finder, Cabinet Office.