Windsor Girls School Boiler Replacement
Windsor Learning Partnership Active Tender notice
- Buyer
- Windsor Learning Partnership
- Estimated value
- £160,000 including VAT
- Procedure
- Below threshold - open competition
- Category
- Works
- CPV code
45000000Construction work- First published
- 13 Apr 2026
- Last updated
- 13 Apr 2026
- Legal basis
- Procurement Act 2023
Description
Small Plant Room:
* Provision of all RAMS prior to commencement of work
* Heras fencing to secure area of works during project, including warning signs
* Removal and disposal of all associated waste during project
* Isolation of current gas, water and electrical supplies to facilitate works
* Removal and disposal of existing boilers
* Supply and fit 4 x Vaillant Ecotec VU GB 120kw modular boilers
* Boilers to be installed in 1 x banks of 4 on manufacturer supplied frames
* Supply and install 1 x 480kw insulated plate to plate heat exchangers connected to existing system
* Supply and install new gas fired water heater and flue systems
* Supply and install pressurisation unit to new boiler system
* Alterations to existing BMS system to accept new boilers
* Alterations to existing electrical supplies to facilitate new install
* Provision of scaffolding for installation of new flue system and connection to boilers
*Weather compensation to new boilers
* Existing pumps to be retained
* Alteration to all existing primary pipework to facilitate installation of new boilers
*Installation of phenolic foil faced lagging to all pipework
* Manufacturer commissioning to new boilers
* Water treatment to existing heating pipework
* Provision of M&E file upon completion
* Provision of all relevant certification
* Provision of contingency amount for asbestos survey and removal if required.
Sports Hall Plant Room:
* Provide relevant RAMS prior to commencement of work
* Apply cordex floor protection to area of work
* isolate gas, water and electrical supplies
* Remove and dispose of existing combined hot water and boiler unit
* Supply and install 2 x new Vaillant ecoTEC 65kw condensing boiler
* Alter pipework to boiler room as required
* install new 300 litre unvented hot water cylinder
* Install back up immersion supplies
* Carry out chemical cleans of system
* Install 35mm magnaclean magnetic sludge filter
* Run new correctly sized gas supply externally from gas meter to new boilers
* Run new condensate pipework to new boilers
*refill and inhibit system
* Balance heating
* Provide gas safety certificate
*Provide Compliance certificate
* Provide manufacturers warranty 5 years
* Make good to external brickwork
* Clearance of all waste