WASHWOOD HEATH DEPOT & NETWORK INTEGRATED CONTROL CENTRE FOR HS2 Limited
Hs2 Active Tender notice
- Buyer
- Hs2
- Estimated value
- £275,000,000 as published; Contracts Finder does not say whether VAT is included
- Procedure
- Other - Find a Tender Service
- Category
- Works
- CPV code
34946000Railway-track construction materials and supplies- First published
- 16 Feb 2021
- Last updated
- 16 Feb 2021
- Rules
- Before the Procurement Act 2023: the Public Contracts Regulations 2015 and earlier rules, or below their thresholds
Description
The WWH&NICC Contractor will be responsible for the design, fabrication, assembly, supply, construction, installation, supervision, inspection, testing, system commissioning and safety authorisation of a rolling stock depot and the design, build and commissioning of a Network Integrated Control Centre at Washwood Heath in Birmingham (including maintenance of all the works up to their completion). The Washwood Heath Depot will be the single rolling stock maintenance and servicing facility for HS2 Phase One.
The scope is further detailed in the PQQ pack and Contract Notice but includes:
- A maintenance building located within the depot - building foundations, substructure, superstructure, cladding, lighting, acoustics, heating, ventilation, drainage and power connections, utility connections, welfare and domestic provisions, building security and a building management system. The maintenance building will contain light and heavy maintenance plant and equipment facilities (gantry cranes, mono rail cranes, access gantries, access pits, inspection and maintenance roads, heavy cleaning facility, heavy lift and bogie drop facilities, depot offices, depot control centre, pantograph test facility, biohazard facility, building management system and workshop and storage areas etc);
- Depot infrastructure including: reception/departure roads, track/permanent way, test track, switches & crossings, overhead catenary system, stabling/cleaning sidings, depot signalling system, depot protection system, telecoms system, automatic vehicle inspection units, wheel lathe(s), carriage wash machines, toilet emptying facilities, platforms, walkways, train crew booking facilities and a separate heavy cleaning facility. Provision of non-traction High Voltage and Low Voltage power network for all plant, equipment and buildings and all Protection & Controls and Supervisory Control and Data Acquisition associated with the traction and non-traction switchgear. Provision of all mechanical and electrical systems throughout the depot and associated buildings;
- A Network Integrated Control Centre building located within the depot area, including building foundations, substructure, superstructure, cladding, lighting, acoustics, heating, ventilation, drainage and power connections, utility connections, operational and incident control rooms, training and IT systems room, offices, ancillary rooms, welfare and domestic provisions, building services, building security and a building management system;
- Car parking facilities, gatehouse, site security and lighting within the depot area and the provision of site drainage and all utilities related to the depot and connections to the main utility networks;
- Design integration with the other HS2 Ltd contractors (Rail Systems, Civils, Rolling Stock and the Depot Facility Owner (DFO));
Notices
- 16 Feb 2021 Tender notice
Contracts Finder holds the official notices, with their documents and contact details.