Estimated value
£730,000 as published; Contracts Finder does not say whether VAT is included
Awarded value
£730,000 as published, VAT not stated
Procedure
Other - Direct Award
Category
Services
CPV code
50532400 Repair and maintenance services of electrical distribution equipment
First published
1 Apr 2026
Last updated
1 Apr 2026
Rules
Before the Procurement Act 2023: the Public Contracts Regulations 2015 and earlier rules, or below their thresholds

Description

The Longbridge Weir Hydropower House was constructed in 2011 to generate renewable electricity, primarily for the Council House. Derwent Hydroelectric Power Ltd was the original designer and constructor of the installation and has provided operation and maintenance services since commissioning.

The plant has now been operational for approximately 14 years. As it approaches the later stages of its asset lifecycle, several major components are at increased risk of failure due to age and will require replacement within the next five years. Ongoing operation and maintenance therefore require specialist technical knowledge of
the original design and construction of the installation.

Accordingly, a direct award is permitted under the Procurement Act 2023, Schedule 5, item 6(a), as competition is absent for technical reasons and only a particular supplier can supply the required
services. The market for contractors capable of maintaining and upgrading a small-scale hydropower installation of this nature is extremely limited. The plant requires a cost-effective 24-hour emergency response capability, which most specialist providers are unable to deliver. Derwent Hydroelectric Power Ltd is locally based, enabling this requirement to be met. As the original constructor, the supplier also has detailed and unique knowledge of the plant, presenting a significant technical barrier to alternative providers. The small scale of the installation further reduces commercial viability for other contractors. These market conditions are not expected to change.

Awards

SupplierValueDateStatus
Derwent Hydroelectric Power Limited £730,000 9 Feb 2026 Active

Notices

  1. 1 Apr 2026 Contract award

Contracts Finder holds the official notices, with their documents and contact details.