  "ocid": "ocds-h6vhtk-05f589",
  "slug": "vyrnwy-frankton-ieoi-pqq-05f589",
  "rules": "Procurement Act 2023",
  "vat_stated": true,
  "title": "Vyrnwy Frankton IEOI PQQ",
  "display_title": "Vyrnwy Frankton IEOI PQQ",
  "url": "https://opencontracts.uk/contract/vyrnwy-frankton-ieoi-pqq-05f589",
  "json_url": "https://opencontracts.uk/contract/vyrnwy-frankton-ieoi-pqq-05f589.json",
  "buyer": {
    "name": "GREEN GENERATION ENERGY NETWORKS CYMRU LIMITED",
    "display_name": "Green Generation Energy Networks Cymru Limited",
    "slug": "green-generation-energy-networks-cymru-limited",
    "url": "https://opencontracts.uk/buyer/green-generation-energy-networks-cymru-limited",
    "json_url": "https://opencontracts.uk/buyer/green-generation-energy-networks-cymru-limited.json"
  },
  "status": "planning",
  "open_for_tenders": false,
  "stage": "Preliminary market engagement notice",
  "method": null,
  "category": "works",
  "cpv_code": "31321000",
  "cpv_description": "Electricity power lines",
  "description": "This Invitation for Expressions of Interest (IEOI) is issued by Green GEN Cymru Limited to seek expressions of interest for the provision of the Packages 1 - 4 for the Vyrnwy Frankton Project.\nTh purpose of this document is to:\na)\tInform the market of:\n(i)\tThe scope of services; and\n(ii)\tAn outline of the procurement process and timeline;\nb)\tInvite parties to express their interest in participating in the Invitation to Tender (ITT) stage for each Package; and\nc)\tSeek preliminary responses to a Pre-Qualification Questionnaire (PQQ) to derive a shortlist of Tenderers to be invited to participate in the ITT for each Package.\n1.2\tProject Background\nThe Green GEN Cymru portfolio, Vyrnwy Frankton, is to be serviced by a 132kV high-capacity double circuit connecting into National Grid Electricity Transmission (NGET) Network. The main line comprises overhead steel lattice tower. The Green GEN Cymru contracted generation connections will be made via a network of 132kV wood pole circuits, underground cables, switching and substations. \nFEED contract is in place to provide the initial design detail and is being delivered by Stantec. The consultant is undertaking the Principal Designer role during the FEED contract phase; the Principal Design role will be transferred to the Detailed Designer.\n1.3\tScope\n1.3.1\tPackage 1 - Substations \nThe Vyrnwy Frankton electrical network comprises 7 distinct sites, which include:\n• \tSwitching Stations\n• \tCollector Stations\n• \tTransformer Substations\nSeveral sites will incorporate:\n• \tReactive Power Compensation Systems\n• \tHarmonic Filtering Equipment\nThe Contractor is expected to design, install, construct, and commission the following but not limited to:\nCivil Works\n•\tSite platforms and foundations\n•\tControl buildings and auxiliary structures\n•\tInternal / External Access roads \n•\tTransformer Bund\n•\tCable troughs\n•\tSurface / Foul / Oily water drainage (as required)\n•\tSite Security\n•\tWater Supply\n•\tFire Fighting Supply\n•\tFlood Resilience (as required) \n•\tLandscaping / screening (as required)\n•\tConstruction Compound\nPrimary Works\n• \tHigh-voltage switchgear\n• \tPower transformers\n• \tInstrument transformers\n• \tBusbars, disconnectors, and circuit breakers\n• \tReactive compensation units (e.g., capacitor banks, STATCOMs)\n• \tHarmonic filtering equipment\nSecondary Works\n• \tProtection systems (relays, merging units)\n• \tControl systems (SCADA, RTUs, PLCs, GPS clock)\n• \tBuilding Management System (HVAC, lighting, security)\n• \tCommunication infrastructure\n• \tMetering and monitoring systems\nThe switching/substation sites proposed for are indicated as follows:\nSite Name\nLower Frankton Switching Station\nCors y Gareg Collector Station\nLlyn Lort I Energy Park Switching Station\nRhiwlas Substation\nBanc Du Energy Park Switching Station\nEsgair Galed Energy Park Switching Station\nWaun Hesgog Energy Park Switching Station\nThe Contractor is expected to establish temporary working areas to include construction compounds, laydown areas, parking and welfare facilities. The Contractor is expected to provide as-built records once construction is complete.\nPackage 2 - Tower line\nThe double circuits from the NGET points of connection into mid Wales are predominantly overhead, with steel lattice towers of the L7(c) design carrying twin ACCC (Aluminium Conductor Composite Core) \"Hamburg\" conductors and an OPGW earth wire.\nThe successful contractor will be responsible for the full detailed design and construction works associated with Vyrnwy Frankton tower line needs.\nThe total route length of the tower line for Vyrnwy Frankton is approximately 45km.\nThe intent is that the following long-time items will be procured by GGC and novated to the contractor:\n•\tTower steel work\n•\tACCC phase Conductor system\nDesign Works:\nFull tower loading and strength assessment for the initial alignments produced by the FEED contractors, to include the detailed design of any tower strengthening requirements where necessary.\nThe design of all tower foundations.\nFull electrical clearance assessment to include conductor profiling and tower wire clearance assessments, including production of route profiles and wire clearance diagrams.\nSelection of insulators and fittings to Green Gen Cymru specifications, including production of component and string drawings.\nProduction of sag/tension book for conductor erection.\nConstruction Works:\nEstablishment of temporary working areas and accesses to include construction compounds, laydown areas, parking, welfare facilities, offsite road improvements, haul roads, drainages (pre and post construction as required) and soil management.\nProcurement of all materials and components not free-issued by Green GEN Cymru (currently anticipated to be tower steelwork, ACCC phase conductor, and ACCC phase conductor fittings).\nInstallation of foundations, erection of towers, conductors, earth wire, insulators and fittings.\nDesign and construction of any required crossing protections e.g. scaffolds for road / rail crossings.\nProvision of as-built records once construction complete.\nPackage 3 - Underground Cable\nThe Vyrnwy Frankton electrical network comprises 132kV and 33kV underground cable circuits and may require section of undergrounding in some of the overhead line circuits.\nThe successful contractor will be responsible for the full detailed design and construction works associated with Vyrnwy Frankton underground cable needs.\nThere are 3.5km of 132kV cable circuit (~180MVA capacity) and 3.5km of 33kV cable circuit (~50MVA capacity) associated with the Vyrnwy Frankton portfolio. Additional undergrounding section may be required through detailed design of the overhead circuits with different capacity requirements.\nDesign Works:\nFull cable system design from the initial assessments produced by the FEED contractor. \nThe electrical design to include but not limited to:\n•\tLoad and short circuit studies\n•\tCable sizing and selection\n•\tEarthing/bonding design\n•\tThe civil design to include but not limited to:\n•\tTrench and duct design\n•\tJoint bay/link box design\n•\tTermination structures\nConstruction Works:\nEstablishment of temporary working areas and accesses to include construction compounds, laydown areas, parking, welfare facilities, offsite road improvements, haul roads, drainages (pre and post construction as required) and soil management.\nProcurement of all materials and components.\nInstallation of ducted cable system including trenchless methods where necessary.\nDesign and construction of any crossing protections/methodologies.\nProvision of as-built records once construction is complete.\nPackage 4 - Wood Pole\nThe wood pole lines for Vyrnwy Frankton network will be to the ENATS 43-50 \"Trident\" design and strung with either the \"Upas\" AAAC alloy conductor or \"Oslo\" ACCC high-temperature low sag conductor. An additional underslung fibre-optic cable will also be used.\nThe successful contractor will be responsible for the full detailed design and construction works associated with Vyrnwy Frankton wood pole requirements.\nThere are 3 wood pole circuits associated with Vyrnwy Frankton cover a total route length of approximately 100km.\nDesign Works:\nFull pole and steelwork loading and strength assessment for the initial alignments produced by the FEED contractors, to include the detailed design of any strengthening requirements where necessary.\nThe design of all foundations.\nFull electrical clearance assessment to include conductor profiling and wire clearance assessments, including production of route profiles and wire clearance diagrams.\nSelection of insulators and fittings to Green GEN Cymru specifications, including production of component and string drawings.\nProduction of sag/tension book for conductor erection.\nConstruction Works:\nEstablishment of temporary working areas and accesses to include construction compounds, laydown areas, parking, welfare facilities, offsite road improvements, haul roads, drainages (pre and post construction as required) and soil management.\nProcurement of all materials and components noting that in the case of Oslo ACCC the conductor and conductor fittings are anticipated to be free-issued by Green GEN Cymru.\nInstallation of foundations, erection of poles, conductors, fibre cable, insulators and fittings.\nDesign and construction of any required crossing protections e.g. scaffolds for road / rail crossings.\nProvision of as-built records once construction complete.\n1.4\tKey Considerations - All Packages\nAll Equipment specified will be compliant with relevant national/international standards (e.g. IEC and BS EN) for a tower lines, wood pole lines, underground cable and substation environments.",
  "currency": null,
  "estimated_value": null,
  "estimated_value_gross": null,
  "awarded_value": null,
  "awarded_currency": null,
  "awarded_is_gross": false,
  "is_framework": false,
  "tender_deadline": null,
  "first_published": "2025-12-15T11:36:48+00:00",
  "last_updated": "2025-12-15T11:36:48+00:00",
  "lots": [
    {
      "id": "1",
      "title": null,
      "status": "planning",
      "value": null,
      "value_gross": null,
      "currency": null,
      "source": "find_a_tender",
      "source_url": "https://www.find-tender.service.gov.uk/Notice/082823-2025",
      "retrieved_at": "2026-11-18T17:26:08.198525+00:00"
    }
  ],
  "awards": [],
  "contracts": [],
  "notices": [
    {
      "notice_id": "082823-2025",
      "label": "Preliminary market engagement notice",
      "date": "2025-12-15T11:36:48+00:00",
      "url": "https://www.find-tender.service.gov.uk/Notice/082823-2025",
      "source": "find_a_tender",
      "source_url": "https://www.find-tender.service.gov.uk/Notice/082823-2025",
      "retrieved_at": "2026-11-18T17:26:08.198525+00:00"
    }
  ],
  "licence": "Open Government Licence v3.0",
  "licence_url": "https://www.nationalarchives.gov.uk/doc/open-government-licence/version/3/",
  "attribution": "Contains public sector information licensed under the Open Government Licence v3.0. Source: Find a Tender and Contracts Finder, Cabinet Office.",
  "source": "find_a_tender",
  "source_url": "https://www.find-tender.service.gov.uk/Notice/082823-2025",
  "retrieved_at": "2026-11-18T17:26:08.198525+00:00",
  "provenance": {
    "source": "find_a_tender",
    "source_url": "https://www.find-tender.service.gov.uk/Notice/082823-2025",
    "retrieved_at": "2026-11-18T17:26:08.198525+00:00"
  }
}