Upper Thurne Construction Works - Package 2

Broads (2006) Internal Drainage Board Complete Contract change notice

Buyer
Broads (2006) Internal Drainage Board
Estimated value
£20,000,000 excluding VAT; £24,000,000 including VAT
Awarded value
£9,465,953 excluding VAT where the notices give it
Procedure
Competitive flexible procedure
Category
Works
CPV code
45232150 Works related to water-distribution pipelines
First published
29 Oct 2025
Last updated
20 Aug 2026
Legal basis
Procurement Act 2023

Description

This procurement covers the design and construction of 3 x pumping stations, namely Martham pumping station, Potter Heigham pumping station and Brograve pumping station. It also allows for the optionality of adding one additional similar pumping station site namely Somerton South Pumping Station and Culvert or Repps pumping station at a future date. Each of these sites has an existing pumping station which will need to be decommissioned. Any instruction for one of the two optional sites is expected to be within 12 months of the Contract Date.
The value was estimated at £8-£12million for the initial 3 sites with up to a further £6million for the fourth site depending on works required. These figures are exclusive of VAT. These works are to be funded from Environment Agency Grant in Aid.
The works and its objectives are entirely consistent to ensure compliance with the BIDB statutory duties as a Section 28g body under the Wildlife and Countryside Act 1981 (as amended).
The scope of the works:
 Design and construction for the 3 pumping stations. Design is limited to the following design tasks (Refer Section S300 of the Scope)
 Telemetry system
 External lighting
 Control kiosk including HVAC
 Motor Control Centre and full electrical system design including Functional Design Specification
 Stop log systems and non return / control valves
 Ducting and draw pit numbers and dimensions
 Precast Concrete Units
 MCC support frame
 Temporary works including relevant licences, permissions and consents
 Associated civil, mechanical and electrical works
 Integration with existing water infrastructure
 Testing, commissioning and handover to operations
 Sectional Completion
 Decommissioning of existing 3 pumping stations
 Potential for all of the above for 4th site.

Awards

SupplierValueDateStatus
BAM Nuttall Limited £9,465,953 20 Mar 2026 Active

Contracts

ContractValuePeriodSignedDocuments
Upper Thurne Package 2 Construction WorksActive £9,465,953 14 Apr 2026 to 10 Sep 2028 14 Apr 2026 Signed contract
Signed contract
Notice
Notice

Notices

  1. 29 Oct 2025 Planned procurement notice 069212-2025
  2. 13 Nov 2025 Tender notice 073686-2025
  3. 20 Mar 2026 Contract award notice 025779-2026
  4. 8 May 2026 Contract details notice 042209-2026
  5. 20 Aug 2026 Contract change notice 079617-2026