University of Sunderland - National Glass Centre - Boiler Replacement

University of Sunderland Active Tender notice

Buyer
University of Sunderland
Procedure
Open procedure (below threshold)
Category
Works
CPV code
45000000 Construction work
First published
15 Jun 2020
Last updated
15 Jun 2020
Rules
Before the Procurement Act 2023: the Public Contracts Regulations 2015 and earlier rules, or below their thresholds

Description

Specification for Authority

The works consist of replacing the existing boiler, flue, pumps, controls and associated
equipment. To enable new boiler plant to be installed, existing equipment shall be stripped
out as shown and described in this document and on the drawings. The existing boiler plant
must remain in operation throughout the works until the final switch over. The main
contractor shall be the mechanical contractor and should allow for all works necessary to
complete the project, including builders work, electrical works, any structural input required,
approvals, issuing of all necessary documentation and notifications.
In addition to the new boiler plant, electric water heaters shall be installed, and the existing
centralised hot water system stripped out/back. All works are described on the drawings and
within the specifications.

Additional information:
Expression of interest and tender documents via the University of Sunderland E-Portal.
https://in-tendhost.co.uk/universityofsunderland/aspx/Home

Is a Recurrent Procurement Type? : No

Notices

  1. 15 Jun 2020 Tender notice

Contracts Finder holds the official notices, with their documents and contact details.

Data