# Transpennine Route Upgrade Programme – York Electrical Control Room Relocation

Network Rail Infrastructure Limited · Complete · Contract award notice

- Buyer: Network Rail Infrastructure Limited
- Awarded value: £5,108,484
- Procedure: Direct award
- Category: Works
- CPV code: 45351000 Mechanical engineering installation works
- First published: 26 November 2025
- Last updated: 18 December 2025
- Legal basis: Procurement Act 2023

## Description

Network Rail is to award a contract via direct award under the Procurement Act 2023 to Siemens Mobility Limited. 
The new TRU electrified route will need to be controlled from the York ECR and the existing integrated electrical control centre (IECC) cannot be expanded any further. This project is required to relocate the control room from its current location to a new proposed location. 
RailCom Manager is the existing Supervisory Control and Data Acquisition (SCADA) system within the current York IECC and has been installed since 2013. The newly installed TRU electrical infrastructure will need to feed into the new, York ECR and align itself with the SCADA system operating in that location (RailCom).

## Awards

| Supplier | Value | Date | Status |
|---|---:|---|---|
| Siemens Mobility Limited | £5,108,484 | 16 Dec 2025 | Pending |

## Notices

- 26 Nov 2025: Transparency notice (077381-2025) https://www.find-tender.service.gov.uk/Notice/077381-2025
- 18 Dec 2025: Contract award notice (084443-2025) https://www.find-tender.service.gov.uk/Notice/084443-2025

---
Page: https://opencontracts.uk/contract/transpennine-route-upgrade-programme-york-electrical-control-room-relocation-05e988
Contains public sector information licensed under the Open Government Licence v3.0. Source: Find a Tender and Contracts Finder, Cabinet Office.