# Toilet Blocks Complete Refurbishment

University Of Wolverhampton Enterprise Limited · Complete · Contract award

- Buyer: University Of Wolverhampton Enterprise Limited
- Procedure: Other - 
- Category: Works
- CPV code: 45453000 Overhaul and refurbishment work
- First published: 13 October 2015
- Last updated: 13 October 2015
- Rules: before the Procurement Act 2023 (published on Contracts Finder)

## Description

Refurbishment works of all toilet blocks within the school.

Refurbishment will consist of, but not be limited to the following;

•	Preliminaries, survey and facilitating works
•	Removal of all existing flooring and sub-bases in all toilet areas and replace with new bases, edges, coving  and appropriate floor covering materials – finishes to be agreed with the Client (Fairway  Primary) and EC MAT
•	If required, undertake camera survey of all drains to confirm integrity of structure and condition
•	Removal of all existing toilet cubicles, doors and partitions  and replace with new installations – finishes and final configurations to be agreed with the Client and EC MAT
•	Removal of all existing items of sanitary ware fixtures and fittings and replace with new and to be self-contained / boxed in / integral to overall design – to include finishing surfaces, cupboards, service access, etc.- finishes and final configurations to be agreed with the Client and EC MAT
•	Install new doors and architraves, to all doors to include ironmongery, push plates, kick plates, handles, etc.
•	Removal of and/or relocate all existing plumbing, heating and electrical services with new and where possible, to be self-contained / boxed in 
•	To remove all existing dilapidated heaters / and provide all new wall mounted heaters, boilers, automated hand dryers and radiators – Final quantities and locations to be agreed
•	Provide new lighting installations in all toilets to ensure appropriate levels and emergency fittings as required – contractors are to propose most energy efficient appliances and fittings
•	To board, skim and decorate all walls and ceilings as required – final colour scheme to be agreed with Client and EC MAT
•	To board over ceilings / raise up if possible and redecorate - final colour scheme to be agreed with Client and EC MAT
•	Install tiling to ‘half way up’ around all walls in all toilets – final colour scheme to be agreed with Client and EC MAT
•	Where found, remove all existing old and damaged extraction systems and services and install new with appropriate special flow and extraction rates – these may be linked to lighting sensors
•	Install as and where required new and additional services to include plumbing, heating electrical works to fuse boards, Boilers and mains services
•	IMPORTANT NOTE: all modification and/ replacement works to electrical, gas and water supplies will fully comply with statutory, industry and regulatory requirements – certification of all installations is required
•	All works to include disposal off site of all materials as required
•	Any on site storage requirements may be agreed with the Client, however, Contractor(s)  included a sum for external separate storage for tools, equipment and supplies

## Awards

| Supplier | Value | Date | Status |
|---|---:|---|---|
| Igloo FM Facilities Management & Support Services | - | 6 Oct 2015 | Active |

## Notices

- 13 Oct 2015: Contract award https://www.contractsfinder.service.gov.uk/Notice/34a63140-8910-474c-8984-be41d76d5c53

---
Page: https://opencontracts.uk/contract/toilet-blocks-complete-refurbishment-e1c3c837-adc8-11e6-9901-0019b9f3037b
Contains public sector information licensed under the Open Government Licence v3.0. Source: Find a Tender and Contracts Finder, Cabinet Office.