The Pirbright Institute Brooksby Building - SIL 1 HVAC Shutdown System from Overpressure and Underpressure Hazard Scenarios

The Pirbright Institute Active Tender amendment

Buyer
The Pirbright Institute
Estimated value
£100,000 as published; Contracts Finder does not say whether VAT is included
Procedure
Open procedure (below threshold)
Category
Works
CPV code
45331210 Ventilation installation work
First published
15 Jun 2023
Last updated
21 Jul 2023
Rules
Before the Procurement Act 2023: the Public Contracts Regulations 2015 and earlier rules, or below their thresholds

Description

Following a Layers of Protection Analysis (LOPA), The Pirbright Institute requires the design and construction of a safety system that detects overpressure and underpressure of various areas and rooms in the Brooksby facility. The system subsequently responds by shutting down the ventilation system by turning off supply and extract fans. As per Functional Safety standards IEC 61508 and IEC 61511, Pirbright requires this system to be reliable to Safety Integrity Level (SIL) 1. Safety Requirement System (SRS) attached at the back of this document for more detail.

Pirbright expects that the designer will have good awareness of the above-mentioned functional safety standards, and to be able to carry out their activities in adherence to the functional safety lifecycle phases as per IEC 61511. A non-exhaustive list of typical deliverables for such a project is as follows:

• Data sheets for all sensing elements (e.g., level switch), logic solvers and all final elements (e.g., valves)
• Bill of Materials (BoM) for all materials and accessories to be purchased
• Quotations for all required materials
• Functional logic diagrams (if required)
• I/O lists
• Functional Design Specifications (FDS)
• Loop diagrams
• Instrument wiring diagrams
• Electrical wiring diagrams
• Control panel layout and drawings
• Safety Integrity Level (SIL) Verification report
• SIL certifications for all relevant hardware (if available)
• Factory Acceptance Test (FAT) procedures
• Site Acceptance Test (SAT) procedures
• Safety Instrumented System (SIS) installation and commissioning plan
• SIS validation plan
• Safety manuals
• Proof test procedure
• Spare parts list
• Assets' register ready for upload to Pirbright Computerised Maintenance Management System (CMMS).

Notices

  1. 15 Jun 2023 Tender notice
  2. 4 Jul 2023 Tender amendment
  3. 21 Jul 2023 Tender amendment

Contracts Finder holds the official notices, with their documents and contact details.