OpenContracts

Thames Tideway Tunnel - C405 Main Works West - Main Tunnel Approach Ventilation System for Secondary Lining Works

BMB Joint Venture (BAM Nuttall, Morgan Sindall PLC & Balfour Beatty) Complete Contract award

Buyer
BMB Joint Venture (BAM Nuttall, Morgan Sindall PLC & Balfour Beatty)
Procedure
Open procedure (below threshold)
Category
Works
CPV code
39563530 Ventilation ducting
First published
11 May 2020
Last updated
8 Jan 2021
Rules
Before the Procurement Act 2023: the Public Contracts Regulations 2015 and earlier rules, or below their thresholds

Description

The Thames Tideway Tunnel project (the Project) will control CSO discharges by intercepting and diverting combined sewage flows into a new storage and transfer tunnel. The main tunnel will run from Acton Storm Tanks in west London to Abbey Mills Pumping Station in the east, where it will connect to the Lee Tunnel, which will transfer the combined sewage to Beckton Sewage Treatment Works for treatment. The Project extends from Acton Storm Tanks in west London, to Abbey Mills Pumping Station in east London. The Project includes associated works at Beckton STW, Shad Thames Pumping Station and Bekesbourne Street.

The geographic layout of the Project and local authorities through which it passes is shown in Figure 1.
The Project comprises:
a. tunnels:
i. a main tunnel which will capture and store combined sewage from CSOs along its route and transfer it to Abbey Mills Pumping Station, from where the Lee Tunnel will transfer it for treatment at Beckton Sewage Treatment Works
ii. 11 connection tunnels, which will link flows from CSOs to the main tunnel.
b. Worksites:
i. five main tunnel Worksites (drive and/or reception sites)
ii. 16 CSO Worksites
iii. two System modification Worksites Thames Tideway Tunnel
iv. works at Beckton Sewage Treatment works.

Scope of Works

Quotation / Prices

The Contractor requires a Subcontractor to provide a quotation for the following items in accordance with this Invitiation to Tender Document:

A. Design of a ventilation system that takes into account the existing ventilation system currently within the tunnel
B. Delivery of the ventilation system to the site
C. Installation of the ventilation system - Optional item
D. Maintenance of the ventilation system (PPM) - Optional item
E. Testing and Commissioning of the ventilation system - Optional item
F. Dismantling of ventilation system - Optional item
G. Collection of the ventilation system from site

Note: The Contractor will consider second hand options dependent on condition, age and location of the system.

The quotation provided should include:

• A system which is compliant with BS6164, EH40 and BTS best practice guidelines
• System plant, equipment and consumables that are available to meet a potential start date on site of 1st October 2020.
• Hire versus Purchase options are to be priced for the ventilation system (if applicable)


Returned quotations will be evaluated by BMB JV's (BAM Nuttall, Morgan Sindall PLC & Balfour Beatty) Procurement team in conjunction with our design and engineering teams.
Quotations will be evaluated based on;
Cost
Timeliness of return
Adherence to and demonstration of understanding of the drawings and specifications provided at this point.
Provision of accurate product specifications to accompany the quotation.

Additional information: Carnwath Road to Acton Storm Tanks

Awards

SupplierValueDateStatus
Not named - 6 Jul 2020 Active

Notices

  1. 11 May 2020 Tender notice
  2. 8 Jan 2021 Contract award

Contracts Finder holds the official notices, with their documents and contact details.

Data