Thames Tideway Tunnel - C405 Main Works West - FRC Works to Shaft Beams at Carnwath Road
BIP Solutions Limited Complete Contract award
- Buyer
- BIP Solutions Limited
- Estimated value
- £100,000 as published; Contracts Finder does not say whether VAT is included
- Awarded value
- £960,434 as published, VAT not stated
- Procedure
- Other - .
- Category
- Works
- CPV code
44114000Concrete- First published
- 4 Sep 2020
- Last updated
- 3 Mar 2022
- Rules
- Before the Procurement Act 2023: the Public Contracts Regulations 2015 and earlier rules, or below their thresholds
Description
The Thames Tideway Tunnel project (the Project) will control CSO discharges by intercepting and diverting combined sewage flows into a new storage and transfer tunnel. The main tunnel will run from Acton Storm Tanks in west London to Abbey Mills Pumping Station in the east, where it will connect to the Lee Tunnel, which will transfer the combined sewage to Beckton Sewage Treatment Works for treatment. The Project extends from Acton Storm Tanks in west London, to Abbey Mills Pumping Station in east London. The Project includes associated works at Beckton STW, Shad Thames Pumping Station and Bekesbourne Street.
The geographic layout of the Project and local authorities through which it passes is shown in Figure 1.
The Project comprises:
a. tunnels:
i. a main tunnel which will capture and store combined sewage from CSOs along its route and transfer it to Abbey Mills Pumping Station, from where the Lee Tunnel will transfer it for treatment at Beckton Sewage Treatment Works
ii. 11 connection tunnels, which will link flows from CSOs to the main tunnel.
b. Worksites:
i. five main tunnel Worksites (drive and/or reception sites)
ii. 16 CSO Worksites
iii. two System modification Worksites Thames Tideway Tunnel
iv. works at Beckton Sewage Treatment works.
Scope of Works
Design, supply and install of formwork and falsework system for the casting of the Carnwath Road shaft beams.
Supply and installing reinforcement.
Placement of free issue concrete.
Temporary works as required.
Returned quotations will be evaluated by BMB JV's (BAM Nuttall, Morgan Sindall PLC & Balfour Beatty) Procurement team in conjunction with our design and engineering teams.
Quotations will be evaluated based on;
Cost
Timeliness of return
Adherence to and demonstration of understanding of the drawings and specifications provided at this point.
Provision of accurate product specifications to accompany the quotation.
Supplier experience of similar projects,evidence of this will be requested should the initial quotation be of interest.
Should the candidate supplier be shortlisted they will then be contacted directly by a member of the BMB Procurement Team within two weeks of shortlisting to discuss the requirement in detail.
BMB Joint Venture (BAM Nuttall, Morgan Sindall PLC & Balfour Beatty)
Carnwath Road Riverside Site - SW6 3HR
Additional information: Carnwath Road Riverside Site - SW6 3HR
Awards
| Supplier | Value | Date | Status |
|---|---|---|---|
| Not named | £960,434 | 30 Nov 2021 | Active |
Notices
- 4 Sep 2020 Tender notice
- 3 Mar 2022 Contract award
Contracts Finder holds the official notices, with their documents and contact details.