OpenContracts

Thames Tideway Tunnel - C405 Main Works West - FRC Works to Aeration Chamber

BIP Solutions Limited Complete Contract award

Buyer
BIP Solutions Limited
Estimated value
£100,000 as published; Contracts Finder does not say whether VAT is included
Awarded value
£565,604 as published, VAT not stated
Procedure
Other - .
Category
Works
CPV code
44114000 Concrete
First published
24 Aug 2020
Last updated
3 Mar 2022
Rules
Before the Procurement Act 2023: the Public Contracts Regulations 2015 and earlier rules, or below their thresholds

Description

The Thames Tideway Tunnel project (the Project) will control CSO discharges by intercepting and diverting combined sewage flows into a new storage and transfer tunnel. The main tunnel will run from Acton Storm Tanks in west London to Abbey Mills Pumping Station in the east, where it will connect to the Lee Tunnel, which will transfer the combined sewage to Beckton Sewage Treatment Works for treatment. The Project extends from Acton Storm Tanks in west London, to Abbey Mills Pumping Station in east London. The Project includes associated works at Beckton STW, Shad Thames Pumping Station and Bekesbourne Street.

The geographic layout of the Project and local authorities through which it passes is shown in Figure 1.
The Project comprises:
a. tunnels:
i. a main tunnel which will capture and store combined sewage from CSOs along its route and transfer it to Abbey Mills Pumping Station, from where the Lee Tunnel will transfer it for treatment at Beckton Sewage Treatment Works
ii. 11 connection tunnels, which will link flows from CSOs to the main tunnel.
b. Worksites:
i. five main tunnel Worksites (drive and/or reception sites)
ii. 16 CSO Worksites
iii. two System modification Worksites Thames Tideway Tunnel
iv. works at Beckton Sewage Treatment works.

Scope of Works

Complete remaining secant piles
Local excavation and break back piles to expose the reinforcement
Design, Supply and Install of formwork to capping beam
Cast capping beam to levels indicated in drawing 3320-AAJV-CARRR-540-SZ-DR-000005 below to act as waling beams including couplers for internal walls and slab where required.
Design, Supply and Install temporary props in accordance with temporary works drawings provided
Excavation to +98.100mATD
Install the dowel bars into the male piles.
Design, Supply and Install Formwork for RC base slab - sumps and upstands
Cast RC base slab
Design, Supply and Install Formwork for RC liner walls
Cast RC liner walls
Design, Supply and Install Formwork for RC internal walls and beams
Cast all RC internal walls and beams
Design, Supply and Install Formwork for slab at ground level
Cast 3.8m width slab at ground level
Removal of temporary props
Design, Supply and Install of falsework to cast top slab
Fill pocket of RC internal wall
Pour top slab in stages as agreed with the Contractor
Striking of falsework
Design, Supply and Install of formwork to top slab upstands.

Returned quotations will be evaluated by BMB JV's (BAM Nuttall, Morgan Sindall PLC & Balfour Beatty) Procurement team in conjunction with our design and engineering teams.
Quotations will be evaluated based on;
Cost
Timeliness of return
Adherence to and demonstration of understanding of the drawings and specifications provided at this point.
Provision of accurate product specifications to accompany the quotation.
Su

Additional information: Carnwath Road Riverside Site - SW6 3HR

Awards

SupplierValueDateStatus
Not named £565,604 30 Nov 2021 Active

Notices

  1. 24 Aug 2020 Tender notice
  2. 3 Mar 2022 Contract award

Contracts Finder holds the official notices, with their documents and contact details.