OpenContracts

Thames Tideway Tunnel - C405 Main Works West - Connection Temporary Supports

BMB Joint Venture (BAM Nuttall, Morgan Sindall PLC & Balfour Beatty) Complete Contract award

Buyer
BMB Joint Venture (BAM Nuttall, Morgan Sindall PLC & Balfour Beatty)
Awarded value
£49,275 as published, VAT not stated
Procedure
Open procedure (below threshold)
Category
Works
CPV code
45262670 Metalworking
First published
8 Oct 2020
Last updated
8 Jan 2021
Rules
Before the Procurement Act 2023: the Public Contracts Regulations 2015 and earlier rules, or below their thresholds

Description

The Thames Tideway Tunnel project (the Project) will control CSO discharges by intercepting and diverting combined sewage flows into a new storage and transfer tunnel. The main tunnel will run from Acton Storm Tanks in west London to Abbey Mills Pumping Station in the east, where it will connect to the Lee Tunnel, which will transfer the combined sewage to Beckton Sewage Treatment Works for treatment. The Project extends from Acton Storm Tanks in west London, to Abbey Mills Pumping Station in east London. The Project includes associated works at Beckton STW, Shad Thames Pumping Station and Bekesbourne Street.

The geographic layout of the Project and local authorities through which it passes is shown in Figure 1.
The Project comprises:
a. tunnels:
i. a main tunnel which will capture and store combined sewage from CSOs along its route and transfer it to Abbey Mills Pumping Station, from where the Lee Tunnel will transfer it for treatment at Beckton Sewage Treatment Works
ii. 11 connection tunnels, which will link flows from CSOs to the main tunnel.
b. Worksites:
i. five main tunnel Worksites (drive and/or reception sites)
ii. 16 CSO Worksites
iii. two System modification Worksites Thames Tideway Tunnel
iv. works at Beckton Sewage Treatment works.

Scope of Works

BMB JV require fabrication and delivery of a Connections Temporary Supports as detailed in the drawings provided with this ITT.

Note the chosen supplier is required to provide: -

• All fixings required to assemble the Connections Temporary Supports
• All items provided as self-colour.

BMB JV request that the number of required deliveries be kept to a minimum. The chosen supplier will adhere to BMB JV's delivery policies and procedures (FORS required)




Returned quotations will be evaluated by BMB JV's (BAM Nuttall, Morgan Sindall PLC & Balfour Beatty) Procurement team in conjunction with our design and engineering teams.
Quotations will be evaluated based on;
Cost
Timeliness of return
Adherence to and demonstration of understanding of the drawings and specifications provided at this point.
Provision of accurate product specifications to accompany the quotation.
Supplier experience of similar projects,evidence of this will be requested should the initial quotation be of interest.
Should the candidate supplier be shortlisted they will then be contacted directly by a member of the BMB Procurement Team within two weeks of shortlisting to discuss the requirement in detail.
BMB Joint Venture (BAM Nuttall, Morgan Sindall PLC & Balfour Beatty)
BMB-JV Tideway West,
Carnwath Road Riverside,
Carnwath Road, London Borough of Hammersmith & Fulham,
SW6 3HR

Additional information: BMB-JV Tideway West,
Carnwath Road Riverside,
Carnwath Road, London Borough of Hammersmith & Fulham,
SW6 3HR

Awards

SupplierValueDateStatus
Not named £49,275 11 Oct 2020 Active

Notices

  1. 8 Oct 2020 Tender notice
  2. 8 Jan 2021 Contract award

Contracts Finder holds the official notices, with their documents and contact details.

Data