# Thames Tideway Tunnel - C405 Main Works West - Connection Culvert Propping Steel

BMB Joint Venture (BAM Nuttall, Morgan Sindall PLC & Balfour Beatty) · Complete · Contract award

- Buyer: BMB Joint Venture (BAM Nuttall, Morgan Sindall PLC & Balfour Beatty)
- Awarded value: £108,201 (VAT not stated)
- Procedure: Other - .
- Category: Works
- CPV code: 45223210 Structural steelworks
- First published: 21 November 2019
- Last updated: 8 January 2021
- Rules: before the Procurement Act 2023 (published on Contracts Finder)

## Description

The Thames Tideway Tunnel project (the Project) will control CSO discharges by intercepting and diverting combined sewage flows into a new storage and transfer tunnel. The main tunnel will run from Acton Storm Tanks in west London to Abbey Mills Pumping Station in the east, where it will connect to the Lee Tunnel, which will transfer the combined sewage to Beckton Sewage Treatment Works for treatment. The Project extends from Acton Storm Tanks in west London, to Abbey Mills Pumping Station in east London. The Project includes associated works at Beckton STW, Shad Thames Pumping Station and Bekesbourne Street. 
    
    The geographic layout of the Project and local authorities through which it passes is shown in Figure 1.
    The Project comprises:
    a. tunnels:
    i. a main tunnel which will capture and store combined sewage from CSOs along its route and transfer it to Abbey Mills Pumping Station, from where the Lee Tunnel will transfer it for treatment at Beckton Sewage Treatment Works
    ii. 11 connection tunnels, which will link flows from CSOs to the main tunnel.
    b. Worksites:
    i. five main tunnel Worksites (drive and/or reception sites)
    ii. 16 CSO Worksites
    iii. two System modification Worksites Thames Tideway Tunnel
    iv. works at Beckton Sewage Treatment works.
    
    Section 4:	Scope of Works
    
    Supply of propping steel as per the Drawing Package.
    
     
     Returned quotations will be evaluated by BMB JV's (BAM Nuttall, Morgan Sindall PLC & Balfour Beatty) Procurement team in conjunction with our design and engineering teams.
    Quotations will be evaluated based on;
    Cost
    Timeliness of return
    Adherence to and demonstration of understanding of the drawings and specifications provided at this point.
    Provision of accurate product specifications to accompany the quotation.
    Supplier experience of similar projects,evidence of this will be requested should the initial quotation be of interest.
    Should the candidate supplier be shortlisted they will then be contacted directly by a member of the BMB Procurement Team within two weeks of shortlisting to discuss the requirement in detail. 
     BMB Joint Venture (BAM Nuttall, Morgan Sindall PLC & Balfour Beatty) 
     HAMPS: Hammersmith Pumping Station, Distillery Road, Hammersmith, W6 9AD

Additional information: HAMPS: Hammersmith Pumping Station, Distillery Road, Hammersmith, W6 9AD

## Awards

| Supplier | Value | Date | Status |
|---|---:|---|---|
| Not named | £108,201 | 2 Jan 2020 | Active |

## Notices

- 21 Nov 2019: Tender notice https://www.contractsfinder.service.gov.uk/Notice/ee8f1948-a94e-4204-b0b5-452ee298a1ad
- 8 Jan 2021: Contract award https://www.contractsfinder.service.gov.uk/Notice/779e7239-9b2b-433a-8630-ed583cc64eca

---
Page: https://opencontracts.uk/contract/thames-tideway-tunnel-c405-main-works-west-connection-culvert-p-58dd4241-04df-4e6d-a50e-9d7871fe7adb
Contains public sector information licensed under the Open Government Licence v3.0. Source: Find a Tender and Contracts Finder, Cabinet Office.

