Tethys- Workington Laboratory Refurbishment
National Nuclear Laboratory Active Tender notice
- Buyer
- National Nuclear Laboratory
- Procedure
- Open procedure
- Category
- Works
- CPV code
39180000Laboratory furniture- First published
- 26 May 2023
- Last updated
- 26 May 2023
- Rules
- Before the Procurement Act 2023: the Public Contracts Regulations 2015 and earlier rules, or below their thresholds
Description
NNL have been requested to install the necessary
equipment to develop a salt clean up development facility within NNL's Workington facility.
The Sub-contractor is required to design, build, and commission a salt clean up development facility within the footprint of an area in the Workington rig hall facility.
The contract is to be placed to fulfil a requirement for a facility that can be used to develop methods for purifying salts from heavy metals.
The new laboratory is to be installed within the old CAF Lab. at NNL's Workington Facility and be operational for 5 years.
The contractor scope of work is limited to the Laboratory facility redevelopment including the procurement and installation of the following equipment to enable operations and future capability: -
• 4 off. Fume hoods
• Double Dissolver
• Precipitation Vessel
• Filtration Boat
• Furnace
• Evaporator
• Waste Liquor collection vessel
• Sink
• Foul waste drainage system
• Deionisation machine
• Room extraction ventilation system
• Fume hood ventilation
• Bottle fed argon and nitrogen supply
• Hydrogen monitor
Laboratory development
The functional requirements are detailed in Project functional Specification: Salt Clean-up Development Facility (MOD12036/06/96/01 issue 1).
Regulation, Standards Testing & Commissioning
CDM, EMC, COSHH, Current Electrical Mechanical, Compressed gases, Heating Ventilation and Drainage manufacture, installation, and commissioning standards.