Temporary Works Designer - Framework
Ferrovial BAM Rail Systems Active Tender notice
- Buyer
- Ferrovial BAM Rail Systems
- Estimated value
- £1,000,000 as published; Contracts Finder does not say whether VAT is included
- Category
- Services
- CPV code
71311000Civil engineering consultancy services- First published
- 1 May 2026
- Last updated
- 1 May 2026
- Rules
- Before the Procurement Act 2023: the Public Contracts Regulations 2015 and earlier rules, or below their thresholds
Description
To construct the main works, the (Ferrovial BAM JV) Track Systems Contractor (FBRS) will develop and operate various compounds (including railheads) along the route, to meet the construction logistics requirements of FBRS and also support the requirements of other Railway System Contractors from the Alliance. These compounds will require temporary works that will not form part of the final permanent works.
The number and location of the compounds to be used are still to be confirmed at this stage:
The Consultant shall achieve integration and coordination between temporary and permanent works design, liaising with the Permanent Works Designer where required.
Examples of the scope of this required design works are as follows (but not limited to) within compounds and railheads-
•Temporary site buildings and offices
•Temporary utilities & services
•Temporary roadways and hardstandings
•Temporary site drainage systems
•Fencing
•Lighting & Security systems
Note: the scope does not include any design of Track layouts and geometry, Track, Track drainage, LWR and S&C hardstanding areas, associated gantry foundations within the railheads.
Potential mobilization start (soft start) in October 2026 - then estimated full start February 2027.
Notices
- 1 May 2026 Tender notice
Contracts Finder holds the official notices, with their documents and contact details.