# Task Order from PDF framework for (619572) M60 River Irk Waterproofing Scheme

National Highways · Complete · Contract award

- Buyer: National Highways
- Estimated value: £181,335 (VAT not stated)
- Awarded value: £181,335 (VAT not stated)
- Procedure: Call-off from a framework agreement
- Category: Works
- CPV code: 45233210 Surface work for highways
- First published: 24 September 2025
- Last updated: 24 September 2025
- Rules: before the Procurement Act 2023 (published on Contracts Finder)

## Description

The M60 River Irk Bridge is a single-span, simply supported underbridge that carries the dual three-lane M60 
Motorway and junction 19 slip roads over the River Irk and a riverside footpath. The deck consists of rolled steel 
beams, acting compositely with in-situ reinforced concrete slab. The deck is split into two halves, separated by a 
longitudinal joint in the central reserve. It is fixed at the west abutment and free at the east abutment. 

The structure was commissioned in 1996 and has a design capacity of HA + 45HB.
During a previous resurfacing scheme over the bridge, the road planer damaged the deck waterproofing. 
According to the Aone+ waterproofing inspection report of 2010, the damage is in lane 3 in the anticlockwise 
direction, near the elastomeric joint on the east side of the bridge. The report also mentions that Volker Laser 
repaired the small, damaged areas however, the quality of repair is not sufficient as a long-term solution. There 
is no assurance of 150mm overlap between the existing waterproofing and waterproofing patch repair. Therefore, 
a long-term waterproofing solution is required on anticlockwise carriageway from stringcourse to stringcourse.

Construction ECI was undertaken FY24/25 which included site surveys and agreement of works methodology
and programme. The detailed design of the scheme has been completed by WSP

## Awards

| Supplier | Value | Date | Status |
|---|---:|---|---|
| Breedon Colas Limited | £181,335 | 15 Apr 2025 | Active |

## Notices

- 24 Sep 2025: Contract award https://www.contractsfinder.service.gov.uk/Notice/ef593689-2f57-46a2-acfe-e2179507ba85

---
Page: https://opencontracts.uk/contract/task-order-from-pdf-framework-for-619572-m60-river-irk-waterpro-856cc2af-b265-4ab7-8e33-c027b59f0e4a
Contains public sector information licensed under the Open Government Licence v3.0. Source: Find a Tender and Contracts Finder, Cabinet Office.