Task Order from PDF framework for 612093 A46 Guys Cliffe Interchange
National Highways Complete Contract award
- Buyer
- National Highways
- Estimated value
- £167,882 as published; Contracts Finder does not say whether VAT is included
- Awarded value
- £167,882 as published, VAT not stated
- Procedure
- Call-off from a framework agreement
- Category
- Works
- CPV code
45233210Surface work for highways- First published
- 15 Sep 2025
- Last updated
- 15 Sep 2025
- Rules
- Before the Procurement Act 2023: the Public Contracts Regulations 2015 and earlier rules, or below their thresholds
Description
A46 Guys Cliffe IC contains two underbridges that carry the dual carriageway Warwick bypass over the
interchange link roads with the A429 and B4115. The two bridges are single span simply supported structures
with composite decks comprised of pre-stressed beams and 200mm thick slabs cast upon permanent formwork
between beams. The end supports are reinforced concrete cantilever abutments, which are constructed in two
sections and separated by a movement joint at the centre line. Each abutment is flanked by reinforced concrete
tapered wing walls. The deck is free to move at the south end and fixed at the north end.
In November 2003, secondary Open Box Beam (OBB) Vehicle Restraint Systems (VRS) were installed on both
sides of both structures to protect the existing substandard BACO Aluminium parapets (P1 System). The OBB
barrier is flared back and connected into the Tensioned Corrugated Beams (TCB) barrier apart from ramped
OBB barrier on the departure end of the South Bridge. This secondary OBB has substandard set-back and
working width.
The bridge records indicate that both bridges were re-waterproofed in 1993 by Acrylic and Polyurethane spray
over the entire deck and again in 2003 with spray applied system at the verges only (on top of new C50 verge
concrete) in conjunction with parapet protection works (OBB barrier installation). This is based on the 2003
Contract Drawing contained within IAMIS (S.22.002/A) and service life can be considered for minimum 35
years.
The existing deck waterproofing at the North Bridge was damaged on both the northbound and southbound
carriageways during a resurfacing intervention in 2013. The waterproofing remains in its damaged state.
Following the option study undertaken by Kier to address the damaged waterproofing at the north bridge and
the substandard secondary protection at both bridges, an addendum to the Options report was submitted.
The addendum VRS replacement option on both bridges is to replace the VRS with new N2 W1 metal VRS and
to replace the current verge with a new reinforced concrete plinth with cast-in cradles to form a fixing for the
VRS and resin anchoring steel 'U' bars into the bridge deck. For the North Bridge, waterproofing will be sprayed
from the new plinth, under the kerb, across the carriageway, and shall form a joint with the existing central
reserve waterproofing in the channel fronting the kerb. For the South Bridge, waterproofing will be sprayed from
the new plinth, under the kerb, and shall form a joint with the existing carriageway waterproofing in the channel
fronting the kerb.
A departure from standards has been approved for the new VRS to have reduced setbacks.
An asbestos survey and adhesion testing of the existing waterproofing will be undertaken in Stage 3.
Awards
| Supplier | Value | Date | Status |
|---|---|---|---|
| Eurovia Infrastructure Limited (Lot 1, 2R and 3R) | £167,882 | 15 Sep 2025 | Active |
Notices
- 15 Sep 2025 Contract award
Contracts Finder holds the official notices, with their documents and contact details.