OpenContracts

T0680 Validation of integral bridge abutment design methods - phase 3

National Highways Complete Contract award

Buyer
National Highways
Estimated value
£149,153 as published; Contracts Finder does not say whether VAT is included
Awarded value
£149,153 as published, VAT not stated
Procedure
Call-off from a framework agreement
Category
Services
CPV code
73220000 Development consultancy services
First published
2 Jul 2025
Last updated
2 Jul 2025
Rules
Before the Procurement Act 2023: the Public Contracts Regulations 2015 and earlier rules, or below their thresholds

Description

This work is looking to provide evidence to improve our understanding of behaviour of integral bridges and validate against numerical modelling and the current BS PD 6694-1 (Recommendations for the design of structures subject to traffic loading to BS EN 1997-1:2004+A1:2013) referenced in CS459 predictions to enable the development of an improved calculation approach for integral bridges more broadly.
This will be achieved by capturing and analysing data over a continuous period of 5 years from the time of construction to support investigation of the soil structure interaction and overall bridge performance. Data will then be interpreted to support analysis of the DMRB.
The strategic objectives of the project are:
- to safely improve the design of construction while reducing capital and carbon costs by more efficient use of materials in future integral bridge construction;
- to provide accurate and reliable measurements to understand the total life cycle for these structures;
- to extend the span length where these type of structures can be sensibly adopted;
- to improve acceptance of this type of structures to further reduce the need for bridge bearings which require periodic disruptive replacement

Awards

SupplierValueDateStatus
Atkins Jacobs Joint Venture £149,153 11 Jun 2025 Active

Notices

  1. 2 Jul 2025 Contract award

Contracts Finder holds the official notices, with their documents and contact details.

Data