Supply of Mechanical & Electrical (M&E) Equipment for the Water Management Zones (WMZ) at Sizewell C site
Sizewell C Limited Active Tender notice
- Buyer
- Sizewell C Limited
- Estimated value
- £1,000,000 as published; Contracts Finder does not say whether VAT is included
- Category
- Goods
- CPV code
24962000Water-treatment chemicals- First published
- 15 May 2025
- Last updated
- 15 May 2025
- Rules
- Before the Procurement Act 2023: the Public Contracts Regulations 2015 and earlier rules, or below their thresholds
Description
This expression of interest (EOI) serves to inform the supply chain about the upcoming procurement for the supply of Mechanical & Electrical (M&E) Equipment for the Water Management Zones (WMZ) at Sizewell C site.
This equipment supply will be desilting type units to control the suspended solid discharge from the outfalls. These units shall be supplied with the pumps and ancillary equipment necessary to lift the water from the discharge network to the treatment plant and for integrating the pump with the control system. These treatment plants will be primarily used to treat surface runoff water collected via the site drainage network, but also includes emergency potable water discharges and some groundwater dewatering that cannot be practically treated at the main groundwater treatment plant.
This table shows the space requirements, power requirements and source and flow rates for each WMZ treatment plant:
WMZ / Treatment plant footprint / Treatment flow rate (l/s (m3/hr)) / Power requirement (kW) / Power source
WMZ 1 12x6m 23.7 (85.3) 15-20 Generator
WMZ 2 12x6m 27.6 (99.4) 15-20 Network
WMZ 3 16x6m 40.7 (147) 35-40 Network
WMZ 5 12x6m 31.2 (112) 20-25 Generator
WMZ 7 25x7.5m 62.0 (223) 35-40 Generator
TMO 25x25m 200 (720) TBC Generator
The treatment plant is only required to manage total suspended solids (TSS); hydrocarbons are assumed to be trapped in the WMZ and will be removed using booms deployed by client. The concentrations for TSS are as follows:
• Outfall to the SSSI 60mg/l
• Outfall to the sea 250mg/l
pH correction is not included at each WMZ but provision of it might be required on some plants.
Notices
- 15 May 2025 Tender notice
Contracts Finder holds the official notices, with their documents and contact details.