OpenContracts

Supply Chain Notice: DELTA Dispersal - CIDP25 - WC1587863 Reconstruction of the Bulk Fuel Bower Park and New Interceptors at RAF Akrotiri D Dispersal , CYPRUS

Ministry of Defence Active Tender notice

Buyer
Ministry of Defence
Estimated value
£1,300,000 as published; Contracts Finder does not say whether VAT is included
Procedure
Competitive quotation (below threshold)
Category
Works
CPV code
45223500 Reinforced-concrete structures
First published
3 Dec 2025
Last updated
3 Dec 2025
Rules
Before the Procurement Act 2023: the Public Contracts Regulations 2015 and earlier rules, or below their thresholds

Description

The location of this project is Cyprus (British Forces, RAF Akrotiri)

WC1587863

Reconstruction of the Bulk Fuel Bower Park of D Dispersal (airfield), as per the design carried out
under WC1315862 , the Works comprise, but not limited to, the following:

- Break up and remove from site the existing concrete layers and other bound material layers.

- Excavate further to reduce levels to sound subgrade.

- Load proof subgrade and supply and lay Type 1 Granular Fill

- Erect formwork, lay polythene sheet, cast brush finish concrete and form joints.

- Seal joints with approved fuel resistant sealant.

- Mark the Refueler Bowser Access Entrance and Parking Area.

- Provide New Earth Points

- Drain Channels

New Interceptors as per the design carried out under WC1299848, the Works comprise, but not limited to, the following:

- Break up and remove from site the existing asphalt and concrete layers and other bound
material layers

- Excavate further to reduce levels to the required levels and sound subgrade

- Carry out works to install the interceptors and connect to the new drainage channels and
main water discharge system

- Reconstruct the defective asphalt parking area with concrete to match the BFVP project
layout

- Load proof subgrade and supply and lay Type 1 Granular Fill

- Erect formwork, lay polythene sheet, cast brush finish concrete and form joints.

- Mark the Sterile Area Markings at the Dispersal Entrance
Further restrictions/instructions:

- Existing topsoil: excavate from required areas to an average depth of 150mm and keep
separate, including bulbs. Upon completion of the works topsoil to be spread to areas at
the same locations

- Trees that need to be trimmed / cut, as per the instructions of Environmental advisor,
works should be carried out by Ground Maintenance (CSP JV).

- Materials to be delivered early on site

- Ground maintenance

- Environmental restrictions

- Antiquities

Additional information:
The Provisional Key Tender dates for the project are as follows:

- Expression of interest: Monday 1stDecember 2025 - Expression of interest return: Monday 08th December 2025 - Invitation to Tender: Monday 12th January 2026 - Tender Return Date: Monday 23rd February 2026 - Contract award (Materials Order): Monday 22nd June 2026 - Commencement of work: Monday 6 th July 2026 - Completion of work (All Sites): Wednesday 30th June 2027 The currency of this project is Euro (€).

The location of this project is Cyprus (British Forces, RAF Akrotiri)

Work commencement and completion dates will be subject to MOD DIO`s agreement or revisions depending on general site operational requirements or limitations.

1. Pre-Qualification Questionnaire (PQQ)
2. Expression of Interest form

The forms must be completed and returned by the interested tenderers

Notices

  1. 3 Dec 2025 Tender notice

Contracts Finder holds the official notices, with their documents and contact details.

Data