Stour Culvert (0182) Major Maintenance works 2020 (Re-waterproofing)
Wigan Council Active Tender notice
- Buyer
- Wigan Council
- Estimated value
- £80,000 as published; Contracts Finder does not say whether VAT is included
- Procedure
- Open procedure
- Category
- Works
- CPV code
45200000Works for complete or part construction and civil engineering work- First published
- 6 Aug 2020
- Last updated
- 6 Aug 2020
- Rules
- Before the Procurement Act 2023: the Public Contracts Regulations 2015 and earlier rules, or below their thresholds
Description
Stour Culvert is an insitu reinforced concrete box structure. The culvert carries Stour Road over the Ellenor Brook watercourse. There is a single carriageway over the bridge for one lane of traffic in each direction.
The works will comprise of excavation of road surfacing and fill material, removal of existing paving slabs, removal of existing waterproofing system to expose the concrete deck, preparation of concrete deck and application of new waterproofing system. This will be followed by reinstatement works including carriageway and footway surfacing, lining and kerbs where necessary.
Additional information:
Re-waterproofing
Notices
- 6 Aug 2020 Tender notice
Contracts Finder holds the official notices, with their documents and contact details.