St John at Hackney Project, Design Services (Structural & M&E Engineering)
St John at Hackney Church Active Tender notice
- Buyer
- St John at Hackney Church
- Estimated value
- £15,694 as published; Contracts Finder does not say whether VAT is included
- Procedure
- Open procedure
- Category
- Services
- CPV code
71312000Structural engineering consultancy services- First published
- 25 Sep 2015
- Last updated
- 25 Sep 2015
- Rules
- Before the Procurement Act 2023: the Public Contracts Regulations 2015 and earlier rules, or below their thresholds
Description
LOT 1
St John at Hackney wishes to engage a suitably qualified design consultant for two phases of work required for:
Structural Engineering.
Part 1: Development Phase
This specialist design service will assist St John at Hackney in preparation for its second round application to the Heritage Lottery Fund, up to the design equivalent of detail required for RIBA Stage 3 (old work stage D).
St John at Hackney will procure the services of an independent Architect incorporating Construction (Design and Management) Regulations 2015 (CDM 2015) acting as the Principle Designer, a Mechanical & Electrical (M&E) Services Engineer and QS consultant.
Part 2: Delivery Phase
There will be a second round process to provide further detailed architectural designs, specifications and cost plans to their final form. This will include managing the procurement, production and build of these schemes from RIBA Stage 4-7 (old work stage E-L) including the contract administration of the construction works by the Architect / Lead designer.
LOT 2
St John at Hackney wishes to engage a suitably qualified design consultant for two phases of work required for:
Mechanical & Electrical (M&E) Services Engineering
Part 1: Development Phase
This specialist design service will assist St John at Hackney in preparation for its second round application to the Heritage Lottery Fund, up to the design equivalent of detail required for RIBA Stage 3 (old work stage D), together with a full planning and listed building consent application.
St John at Hackney will procure the services of an independent Architect incorporating Construction (Design and Management) Regulations 2015 (CDM 2015) acting as the Principle Designer, a Structural Engineer and QS consultant.
Part 2: Delivery Phase
There will be a second round process to provide further detailed architectural designs, specifications and cost plans to their final form. This will include managing the procurement, production and build of these schemes from RIBA Stage 4-7 (old work stage E-L) including the contract administration of the construction works by the Architect / Lead designer.
Notices
- 25 Sep 2015 Tender notice
Contracts Finder holds the official notices, with their documents and contact details.