Department Of Health And Social Care · Planning · Planned procurement

- Buyer: Department Of Health And Social Care
- CPV code: 33000000 Medical equipments, pharmaceuticals and personal care products
- First published: 18 December 2018
- Last updated: 18 December 2018
- Rules: before the Procurement Act 2023 (published on Contracts Finder)

## Description

Agency need a contract to provide annual service, calibration, repairs, modifications and supply of parts original manufacturer (Metall & Plastic) parts for its production filling isolator.  We are under the impression that there is only one supplier which can provide the required service. Before we proceed further, I want to check, can you do this? For further details, please read the following text. 
Description:
The Production isolator is part of a filling line for liquid or Freeze-dried products in screw-capped vials. The isolator houses a B&S filling machine and interfaces with a Serail Freeze dryer. 
The inside of the isolator is designed to be sanitised with Formaldehyde after every run. There are two transfer isolators which are used to transfer equipment and filled vials from one end of the line to the other for the capping process. The isolator runs under negative pressure with HEPA filtration and CG-air distribution system, and has a refrigeration unit with heating and cooling from 4°C to 30°C. 

Annual servicing to include but not limited to:
Visual inspection of CG-membranes - Replace, repair as necessary  
Visual inspection of isolator lighting - Replace, repair as necessary  
HEPA / ULPA integrity testing - Replace, repair as necessary  
Check and adjustment of pressure switches
Leak testing of gloves and half-suit - Replace, repair as necessary  
Leak testing of transfer isolators - Replace, repair as necessary  
Leak testing of pneumatic gaskets - Replace, repair as necessary
Leak testing of filling isolator without transfer isolators - Repair as necessary
Replace compressed air filter
Replace PLC battery
Refrigeration unit Change filter & oil check system for leaks and operation.

Annual Calibration:
Pressure transmitters
Flow sensors 
Temperature sensor
Relative humidity sensor
Pressure gauges 

Potential suppliers if they feel they can meet the requirement should email [email removed] to register an interest.

If no submissions of potential interest are received by close of play 08 January 2019, it is then intended to perform a direct award without competition to the sole supplier we believe can deliver the required service.

## Notices

- 18 Dec 2018: Planned procurement https://www.contractsfinder.service.gov.uk/Notice/3461363d-9dfc-494b-8ade-eb7fac283cad

---
Page: https://opencontracts.uk/contract/service-contract-for-production-filling-isolator-1dba5560-251f-49e9-8e72-cc63e81f751c
Contains public sector information licensed under the Open Government Licence v3.0. Source: Find a Tender and Contracts Finder, Cabinet Office.