SDF Lot 2 North West_ Dyer & Butler Ltd A
Highways England Complete Contract award update
- Buyer
- Highways England
- Estimated value
- £16,122,779 as published; Contracts Finder does not say whether VAT is included
- Awarded value
- £16,122,779 as published, VAT not stated
- Procedure
- Restricted procedure (above threshold)
- Category
- Works
- CPV code
45000000Construction work- First published
- 28 Jul 2022
- Last updated
- 26 Sep 2022
- Rules
- Before the Procurement Act 2023: the Public Contracts Regulations 2015 and earlier rules, or below their thresholds
Description
National Highways continues to roll out the Asset Delivery model to its operational areas. There is a
requirement to deliver a range of renewal, improvement and selected small scheme construction works on the
Strategic Road Network in areas utilising specialist contractors working collaboratively with National Highways
to deliver these works. It is envisaged that this framework will straddle two Road Investment Strategy (RIS)
periods (RIS 2 and RIS 3) enabling a smooth transition between them. Works for schemes have been divided
into a number of workstreams that align with the contractors' specialisms, and will also include design.
Bandings have been introduced into the framework model to differentiate some contracting terms between
bands.
This award is for Lot 2 Drainage in the North West region (National Highways Areas 10 and 13).
This Lot covers the supply of materials, plant and labour to carry out;
- Construction, commissioning and removal of drainage and manhole/catch pits,
- Renewal or recycling of filter drain material,
- Renewal and repair of pipes and pipe lining,
- Renewal of ditches, swales, ponds and any other vegetative treatment systems,
- Control and disposal of contaminated material,
- Installation, commissioning and removal and renewal of flow control equipment, and
- Installation, commissioning and removal and renewal of any other drainage ancillary items including petrol interceptors and pumping station equipment
Other duties
This scope also includes:
- Mobilisation
- Early Contractor Involvement
- Principal contractor
- Welfare facilities
- Manage Network Occupancy
- Community; and
- Contingency
The scope may also include carrying out some of the duties of the Maintenance & Response Contractor and providing Incident Response (Rapid Response) when instructed.
Despite the award of the framework being earlier, contracts are issued inline with regions going live.
Awards
| Supplier | Value | Date | Status |
|---|---|---|---|
| Dyer & Butler Ltd | £16,122,779 | 26 May 2022 | Active |
Notices
- 28 Jul 2022 Contract award
- 18 Aug 2022 Contract award update
- 26 Sep 2022 Contract award update
Contracts Finder holds the official notices, with their documents and contact details.