OpenContracts

SDF Lot 12.1 Midlands_ Amey OW Ltd A

Highways England Complete Contract award update

Buyer
Highways England
Estimated value
£50,584,357 as published; Contracts Finder does not say whether VAT is included
Awarded value
£50,584,357 as published, VAT not stated
Procedure
Restricted procedure (above threshold)
Category
Works
CPV code
45000000 Construction work
First published
28 Jul 2022
Last updated
26 Sep 2022
Rules
Before the Procurement Act 2023: the Public Contracts Regulations 2015 and earlier rules, or below their thresholds

Description

National Highways continues to roll out the Asset Delivery model to its operational areas. There is a
requirement to deliver a range of renewal, improvement and selected small scheme construction works on the
Strategic Road Network in areas utilising specialist contractors working collaboratively with National Highways
to deliver these works. It is envisaged that this framework will straddle two Road Investment Strategy (RIS)
periods (RIS 2 and RIS 3) enabling a smooth transition between them. Works for schemes have been divided
into a number of workstreams that align with the contractors' specialisms, and will also include design.
Bandings have been introduced into the framework model to differentiate some contracting terms between
bands.

This award is for Lot 12.1 Design Services (region) in the Midlands region (National Highways Areas 7 and 9).

This Lot covers the design of highway maintenance, renewal and small improvement and associated services including;
- Structures,
- Landscaping,
- Pavements,
- Drainage,
- Traffic Modelling,
- Traffic signals,
- Geometrical designs,
- Geotechnics,
- Technology,
- Lighting,
- Motorway communications,
- Environmental,
- Noise quality (including non-invasive surveys),
- Air quality (including non-invasive surveys),
- Vehicle restraint systems,
- Depots,
- Preparation of contract documents, and
- Site supervision, and
- Stakeholder engagement/consultation
Other duties
This scope also includes:
- Mobilisation
- Design validation
- Principal designer
- Manage Network Occupancy
- Community
- Contingency, and
- Demobilisation
The scope may also include providing design support as part of Incident Response (Rapid Response) when instructed.

Despite the award of the framework being earlier, contracts are issued inline with regions going live.

Awards

SupplierValueDateStatus
Amey OW Limited £50,584,357 26 May 2022 Active

Notices

  1. 28 Jul 2022 Contract award
  2. 18 Aug 2022 Contract award update
  3. 26 Sep 2022 Contract award update

Contracts Finder holds the official notices, with their documents and contact details.

Data