OpenContracts

SC23206 - DFC2023 - Mini Competition - Fir Tree Road, Tunbridge Wells Scheme

Kent County Council Complete Contract award

Buyer
Kent County Council
Estimated value
£60,000 as published; Contracts Finder does not say whether VAT is included
Awarded value
£55,000 as published, VAT not stated
Procedure
Call-off from a framework agreement
Category
Works
CPV code
45111240 Ground-drainage work
First published
5 Jan 2024
Last updated
5 Jan 2024
Rules
Before the Procurement Act 2023: the Public Contracts Regulations 2015 and earlier rules, or below their thresholds

Description

The Drainage Works Framework 2023 (SC22331) is used to support Kent County Council's current contracts (Highway Term Maintenance Contract, Road Asset Renewal Contract and others) to maintain it network.

The drainage works consist of the provision of labour, resources, plant and materials to carry out all works associated with drainage maintenance works and general reinstatement works on both highway and non-highway sites.

Works under £25k are awarded via direct award on a rotation basis.

Works over £25k are awarded via a mini-competition process.

This notice pertains to a mini-competition exercise that was carried out under the Drainage Works Framework 2023.

Details of this mini-competition are below listed below:
- Aim: to find a Contractor to deliver the Fir Tree Road Tunbridge Wells scheme.
- Dates: The scheme needs to be delivered between the 29 January 2024 to 04 March 2024.
- The scheme will deliver the following outputs, please note that this is not an exclusive list:
• Road closure, advanced warning signs, and letter drops.
• To carry out two trial hole trenches across the full width of the carriageway.
• To replace three existing gullies with new 450mm x 900mm gully pots, and to also install another four new 450mm
x 900mm gully pots.
• To install two new Type 2a chambers in the carriageway.
• To install a new 2.4m dia, 4m deep Type 1 Soakaway (conventional) on the verge of the Commons to KCC
standard. Before excavating for the soakaway, the existing turf is to be cut out, rolled up and set aside for re-use.
Some of the best of the soil is also to be set aside for reinstating.
• To install a total of 49m. new 225mm Twinwall pipe at various locations within the carriageway.
• To install a total of 41.45m of new 150mm Twinwall pipe from the gullies to the new chambers and from the gullies
to the new 225mm and 150mm pipes as indicated on the plans.
• The existing drainage pipe from existing gully to gully crossing the junction of Fir Tree Rd is the be sealed up at
end when the gully is replaced.
• To reinstate the trenches of the Type 4 carriageway to KCC standard detail

Awards

SupplierValueDateStatus
Ferns Surfacing Limited £55,000 12 Dec 2023 Active

Notices

  1. 5 Jan 2024 Contract award

Contracts Finder holds the official notices, with their documents and contact details.

Data