SBIM Surfacing
Amey Ow Limited Active Tender amendment
- Buyer
- Amey Ow Limited
- Estimated value
- £1,500,000 as published; Contracts Finder does not say whether VAT is included
- Procedure
- Competitive procedure with negotiation (above threshold)
- Category
- Works
- CPV code
45233223Carriageway resurfacing works- First published
- 15 Apr 2024
- Last updated
- 16 Apr 2024
- Rules
- Before the Procurement Act 2023: the Public Contracts Regulations 2015 and earlier rules, or below their thresholds
Description
With continuing deterioration and repairs of the existing surfacing, a task order was issued in 2023 for a detail design of the resurfacing of the Prince of Wales (M4) Cable Stay section of the bridge by National Highways.
This is intended as the first phase of the works, with the resurfacing of the Gwent and Avon Viaduct likely to follow suit. The works to include the removal of the existing surfacing, binder course and waterproofing layer of all three lanes up to the edge of the drainage systems within the hard shoulder. This should allow for the proposed waterproofing layer to be 'lapped' in the hard shoulder before reinstatement of the new binder and surfacing layer. Full resurfacing of Cable Stay Bridge including traffic management, any concrete repairs and waterproofing. Works are further detailed within the attached scope and specification documents.
AMEY is seeking bids from qualified Suppliers for the delivery of Surfacing activities on the SBIM project (Severn Bridge)
Bids should be in accordance with the details, terms and conditions, documents detailed herein.
Notices
- 15 Apr 2024 Tender notice
- 16 Apr 2024 Tender amendment
Contracts Finder holds the official notices, with their documents and contact details.