OpenContracts

S30117 Decarbonising concrete by validating the use of lower carbon cement blends for incorporation in the standards - Phase 2

National Highways Limited Complete Contract award

Buyer
National Highways Limited
Estimated value
£340,000 as published; Contracts Finder does not say whether VAT is included
Awarded value
£339,914 as published, VAT not stated
Procedure
Call-off from a framework agreement
Category
Services
CPV code
73220000 Development consultancy services
First published
7 Jul 2026
Last updated
7 Jul 2026
Rules
Before the Procurement Act 2023: the Public Contracts Regulations 2015 and earlier rules, or below their thresholds

Description

This project (Phase 2 of a two-phase programme) specifically aims to investigate and validate the expanded use of lower-carbon binary and ternary blended cements by increasing the proportion of PC replacement with supplementary cementitious materials (SCMs) such as calcined clays, limestone, and other viable alternatives, through a staged laboratory experimental research and testing programme. The research will explore blend combinations and replacement levels that exceed those currently allowed under UK standards, including BS 8500:2023, the Manual of Contract Documents for Highway Works (MCHW), and the Design Manual for Roads and Bridges (DMRB).
By reducing reliance on traditional SCMs such as Ground Granulated Blast Furnace Slag (GGBS) and Fly Ash (FA), which both are subject to supply limitations, this project aims to support the wider adoption of more sustainable and readily available alternatives, including calcined clays and limestone. The project will also provide the technical evidence required to inform future updates to UK concrete standards, supported by the results of an experimental research programme. This work will build on the literature review, feasibility study, and detailed testing specification developed as part of the deliverables from the successfully completed Phase 1 of the project. This will enable the deployment of lower-carbon cement blends at scale while ensuring the durability, performance, and long-term resilience of the UK's concrete infrastructure is maintained.

Awards

SupplierValueDateStatus
Ove Arup £339,914 7 Jul 2026 Active

Notices

  1. 7 Jul 2026 Contract award

Contracts Finder holds the official notices, with their documents and contact details.

Data