OpenContracts

Rodney House Roundabout Works Offsite Highways - Graven Hill Bicester

Cherwell District Council Active Tender notice

Buyer
Cherwell District Council
Estimated value
£1,000,000 as published; Contracts Finder does not say whether VAT is included
Procedure
Restricted procedure
Category
Works
CPV code
45000000 Construction work
First published
26 Nov 2015
Last updated
26 Nov 2015
Rules
Before the Procurement Act 2023: the Public Contracts Regulations 2015 and earlier rules, or below their thresholds

Description

Scope of Preparatory and Ancillary Works

The provision and construction of all preparatory and ancillary works, and the alteration of exising works or features, including:

- comprehensive traffic management to Chapter 8 of The Traffic Signs Regulations and general Directions 200 and agree all with Oxfordshire County council;
- site clearance;
- earthworks and removal of unacceptable material from Site;
- surface water drainage system, including manholes, pipes and gullies;
- Civil Engineering and trenching work for all existing and new utilities;
- supervision and co-ordination of all existing and new utilities;
- individual utility providers shall supply and lay their utility in trenches which are to be excavated and backfilled by the Principal Contractor;
- upgrading of the existing roundabout, carriageway widening to form new carriageway in bituminous material, to accommodate the new Graven Hill Village Development;
- construction of associated bituminous footway and refuge crossings with associated tactile paving slabs;
- installation of traffic signals including MOVA to Oxfordshire county councils specification;
- CCVT installation to Oxfordshire county councils specification;
- kerbs, islands, verges and reservations including the grading and seeding of grassed areas;
- traffic signs, road markings, bollards and pedestrian guard rails;
- Contractor design of an approx., 1.5m retained height retaining wall to support the realigned carriageway with a vehicular restraint system;
- Possible Contractor design of road lighting, but it is understood, assumed that the new street lighting will be designed by Oxfordshire County council;
- minimal landscaping, grass verges;
- alterations and tie in to a private road access;
- make due allowance for the installation of services to serve the new development;
- Civil provision for utility infrastructure services to accommodate the proposed Graven Hill Developments, Gas, water, telecom and electrical services by others;
- works to be varied out under a section 278 Agreement and the contractor would need to comply and work in accordance with the obligations set out within this;
- must be registered on Construtionline;
- comply with the Considerate Constructors Scheme code of practice and be a registered member.

Notices

  1. 26 Nov 2015 Tender notice

Contracts Finder holds the official notices, with their documents and contact details.

Data