# Rockfall Protection System Installation

Dover Harbour Board · Active · Tender amendment

- Buyer: Dover Harbour Board
- Estimated value: £5,000,000 (VAT not stated)
- Procedure: Negotiated procedure without prior publication (above threshold)
- Category: Works
- CPV code: 45243100 Cliff-protection works
- First published: 5 June 2023
- Last updated: 5 June 2023
- Rules: before the Procurement Act 2023 (published on Contracts Finder)

## Description

The Contractor provides the management and implementation of the Rockfall Protection Systems
'Phase II - Phase V', summarised below:

•	Phase II (Envisaged Commencement within 2023)
The installation of a rockfall protection system to the Eastern Docks cliff face (Asset ID: DHB.2900.120.001). The project involves the removal (and disposal of) of the existing rockfall protection barrier(s) and the replacement installation of approximately 223m (linear) of a 5m high (projection) GBE-500A rockfall barrier (and approximately 450m2 of a TECCO Stainless Steel (G65/3) slope stabilisation system) manufactured by Geobrugg AG, within the Eastern Docks, Port of Dover (As indicated on drawing 01578-C001-SP-TE).

•	Phase III Envisaged Commencement within 2024)
The installation of a rockfall protection system to the Eastern Docks cliff face (Asset ID: DHB.2900.120.001). The project involves the removal (and disposal of) of the existing rockfall protection barrier(s) and the replacement installation of approximately 191m (linear) of a 3m high (projection) GBE-500A rockfall barrier manufactured by Geobrugg AG, within the Eastern Docks, Port of Dover (As indicated on drawing 01578-C001-SP-TE).

•	Phase IV Envisaged Commencement within 2025)
The installation of a slope stabilisation system to the Eastern Docks cliff face (Asset ID: DHB.2900.120.001). The project involves the removal (and disposal of) of the existing slope stabilisation systems and the replacement installation of approximately 2750m2 of a TECCO Stainless Steel (G45/2) slope stabilisation system manufactured by Geobrugg AG, within the Eastern Docks, Port of Dover (As indicated on drawing 01578-C001-SP-TE).

•	Phase V Envisaged Commencement within 2026)
The installation of a slope stabilisation system to the Eastern Docks cliff face (Asset ID: DHB.2900.120.001). The project involves the removal (and disposal of) of the existing slope stabilisation system and the replacement installation of approximately 2400m2 of a TECCO Stainless Steel (G45/2) slope stabilisation system (and approximately 12m2 of a SPIDER 'S3-130' rock protection system), manufactured by Geobrugg AG, within the Eastern Docks, Port of Dover (As indicated on drawing 01578-C001-SP-TE).

## Notices

- 5 Jun 2023: Tender notice https://www.contractsfinder.service.gov.uk/Notice/775bdf8d-86b1-449e-8015-ac3c82677ec8
- 5 Jun 2023: Tender amendment https://www.contractsfinder.service.gov.uk/Notice/775bdf8d-86b1-449e-8015-ac3c82677ec8

---
Page: https://opencontracts.uk/contract/rockfall-protection-system-installation-56df7eef-5c5c-499c-8ae8-dfe2b2a24d12
Contains public sector information licensed under the Open Government Licence v3.0. Source: Find a Tender and Contracts Finder, Cabinet Office.