RNN Group - Refurbishment of Clifton Main Switch room
Further Education Colleges Active Tender notice
- Buyer
- Further Education Colleges
- Procedure
- Open procedure
- Category
- Services
- CPV code
51000000Installation services (except software)- First published
- 14 Jul 2016
- Last updated
- 14 Jul 2016
- Rules
- Before the Procurement Act 2023: the Public Contracts Regulations 2015 and earlier rules, or below their thresholds
Description
RNN Group
To replace the electrical switch gear that feeds the Clifton Building as per the attached specification in Appendix 4 & 5
You can apply for this tender via the In-Tend website, if you don't have an account you will need to register. https://in-tendhost.co.uk/fe/aspx/Home
Once registered you will find the tender under the green menu bar (Tenders -> Current). To view the tender documents you will need to 'express an interest' in the tender via the website.
PLEASE NOTE: It is not known when the works will take place or how long they will run for, therefore the contract start & end dates 01/09/2016 to 02/09/2016 are not valid, however the deadline for tender returns of the 19th of August is accurate.
The College has made arrangements for interested tenderers to visit sites as detailed below. Any contractor who does not attend the site visit will not be considered when awarding the works. If you wish to attend the site visit please confirm via the In-Tend e-procurement system as detailed above and report to the appropriate reception on arrival (addresses below).
For Rotherham College Site:-
Site contact Andrew Newton
Visit arranged for 22nd July 2016 at 10:00am
Meet at Wentworth reception, Eastwood Lane, Rotherham, South Yorks S65 1EG
The Contractor must visit site prior to tendering to determine the extent of the works.
Arrangements shall be made by contacting:
Andrew Newton
Head of facilities for RNN Group
Tel: 01709 722850
Brief description below, more details can be found by expressing an interest in the tender and downloading the tender documents.
DESCRIPTION OF THE WORK
ELECTRICAL SCOPE OF WORKS
The Contractor shall be responsible for all aspects of the, procurement, installation, testing,
commissioning and co-ordination (with all other trades) of the complete Electrical Services to
hand over to the client a fully functional installation.
The Contractor and sub-contractors shall arrange to visit site to familiarise themselves with the
site and extent of the works required.
The Electrical Services installations shall comprise of, but not be limited to, the following:
· The installation of a new extension to the Main Switchboard (FS-1) and the transfer of 12
existing supplies to enable the isolation and removal of one section of the “Ottermill”
busbar/switchfuses.
· The installation of a new MCCB Panelboard.
· Transfer of the remaining existing supplies from existing “Ottermill” Busbar/switchfuses to
the new MCCB Panelboard.
· The careful removal and strip out of redundant “Ottermill” Busbar/switchfuses, and the
disposal of electrical services and equipment made redundant by these works.
· Installation of new local distribution boards to the basement electrical switchroom and the
transfer of all existing supplies to this new distribu...
Additional information: Is a Recurrent Procurement Type? : No https://in-tendhost.co.uk/fe/aspx/