Replacement of cladding at Adair Tower and Hazelwood Tower - Design
capitalEsourcing Active Tender notice
- Buyer
- capitalEsourcing
- Estimated value
- £150,000 as published; Contracts Finder does not say whether VAT is included
- Procedure
- Open procedure (below threshold)
- Category
- Services
- CPV code
44212381Cladding- First published
- 14 Mar 2019
- Last updated
- 14 Mar 2019
- Rules
- Before the Procurement Act 2023: the Public Contracts Regulations 2015 and earlier rules, or below their thresholds
Description
The Royal Borough of Kensington and Chelsea is currently removing external cladding from Adair Tower and Hazelwood Tower, two 14 storey tower blocks located in the north of the Borough.
It is intended to replace the cladding on both buildings with an A1 certified fire rated cladding system while at the same time replacing aluminium windows and balcony doors.
The Council is looking to engage an architect that has the direct experience and immediate capacity to undertake the design of the cladding, windows and balcony doors to both towers through to and including RIBA Stage 4.
A structural surveyor has been separately engaged to consider the load that replacement cladding may put on the buildings. Having the direct experience of designing a cladding system that is A1 certified fire rated is an imperative.
Notices
- 14 Mar 2019 Tender notice
Contracts Finder holds the official notices, with their documents and contact details.