Repair of Warrior Hydraulic Pumps and Motors
Babcock International Group PLC Active Tender amendment
- Buyer
- Babcock International Group PLC
- Estimated value
- £621,141 as published; Contracts Finder does not say whether VAT is included
- Procedure
- Restricted procedure (above threshold)
- Category
- Services
- CPV code
50116400Repair and maintenance services of vehicle transmissions- First published
- 30 Nov 2017
- Last updated
- 15 Jan 2019
- Rules
- Before the Procurement Act 2023: the Public Contracts Regulations 2015 and earlier rules, or below their thresholds
Description
Any resultant Contract will be placed with a single Contractor in order to carry out repair activities as follows;
- to repair Articles as per OEM Specification with an accompanying Certificate of Conformity where required.
- to supply all spares/components necessary to undertake the repair process, subsequent packaging to appropriate Military Packing Levels and the delivery of Articles to the Authority post completion of repair activity will be expected.
The Repair will include, but not limited to:
Process of Repair • Repair: All Articles are to be repaired to A1 condition as per OEM Specification. • Component Parts: All faulty, damaged or missing component parts that are required to repair the equipment shall be replaced using the current OEM/Genuine manufacturer's parts or to the OEM Specification, as appropriate. • Replacement parts: The Contractor shall be responsible for the procurement of all replacement parts within the terms and conditions of the contract. When replacement/alternative parts are used because OEM parts are no longer available, Certificates of Conformity are required for all parts which may affect the reliability of the equipment. These certificates shall be made available to the Authority
upon request. • Testing on completion: On completion of the Repair activity, a functional test/inspection shall be carried out on the equipment, in accordance with the OEM Test Specification. All test equipment used is to be provided and maintained by the Contractor. • The Contractor is to keep records of all visits/survey reports, repair approvals, certificates and costs incurred in the repairs to these equipments.
Notices
- 30 Nov 2017 Tender notice
- 15 Jan 2019 Tender amendment
Contracts Finder holds the official notices, with their documents and contact details.