# Redevelopment of EYFS Outdoor Area

St Gilbert's Church Of England Primary School · Active · Tender notice

- Buyer: St Gilbert's Church Of England Primary School
- Estimated value: £30,000 (VAT not stated)
- Procedure: Open procedure (below threshold)
- Category: Works
- CPV code: 44100000 Construction materials and associated items
- First published: 31 January 2025
- Last updated: 31 January 2025
- Rules: before the Procurement Act 2023 (published on Contracts Finder)

## Description

1	Introduction 	

1.1	Company Background
St Gilbert's Church of England Primary School (known as 'the School') is a standalone primary academy.  Academy status was granted in January 2013.

Located to the West of the historic town centre of Stamford, the school currently has 300 pupils form 4 - 11 years of age. 

The current school buildings were established in the early 1970's with a further addition at the beginning of the 2000's.

'The School' is currently rated 'Good' by OFSTED

 
1.2	Project Background
The existing outdoor play area was installed circa 2008/9 and included:
•	Wet pour safe play surface throughout
•	Outdoor secure storage for resources
•	Activity areas and play equipment 

The equipment is now at the end of its economic life and 'the School' are looking to redesign the existing area with a space that is inviting and inspirational for the pupils in the Reception phase of the school


1.3	High Level Overview of Requirements
Bidders are asked to submit a formal tender for the redevelopment of the Early Years outdoor play area 

.
1.4	Existing Provision
The existing provision has the following equipment installed:
•	Wooden picket boundary fencing
•	Wet pour safe play surface throughout
•	Central climbing frame and slide
•	Sand pit
•	Mud pit with activity panels
•	Secure storage for outdoor resources
•	Raised bed planter
•	Covered activity area 

See appendix 1 for photographs of the existing provision 


To create and inviting and inspirational outdoor play area for use by pupils in the Early Years (Reception) phase.

Key requirements are:

•	Removal/recycling of existing facilities including surfacing and timber structures 
•	Ensuring compliant foundations for any new surfacing or structures
•	Design service to be completed in collaboration with 'the School'
•	Provision of equipment that will aid the physical development of all pupils
•	Provision of equipment that will encourage the joy of learning 
•	Provision of equipment that enables creativity in play 
•	Creative design that will enhance the natural world 
•	A safe play surface and equipment compliant with BSEN1176 and BSEN1177 
•	Where possible, as much of the materials to be used are from recycled or sustainable sources
•	Provision of a full maintenance schedule 
•	Use of qualified/registered installers
•	All contractors to be DBS checked

## Notices

- 31 Jan 2025: Tender notice https://www.contractsfinder.service.gov.uk/Notice/15e73579-c9ce-4ede-a999-b77dc2a7142a

---
Page: https://opencontracts.uk/contract/redevelopment-of-eyfs-outdoor-area-7907bf0d-2abd-457f-8655-2bd3a5fce681
Contains public sector information licensed under the Open Government Licence v3.0. Source: Find a Tender and Contracts Finder, Cabinet Office.