OpenContracts

Provision of a Smart Grid and Transmission Line Test Rig(s) for the University of Sunderland

University of Sunderland Active Tender notice

Buyer
University of Sunderland
Procedure
Open procedure (below threshold)
Category
Goods
CPV code
38500000 Checking and testing apparatus
First published
19 Aug 2022
Last updated
19 Aug 2022
Rules
Before the Procurement Act 2023: the Public Contracts Regulations 2015 and earlier rules, or below their thresholds

Description

The School of Engineering at the University is looking to purchase a smart grid and transmission line test rig(s) setup which is suitable for:

o All test rig or rigs should come with both the necessary and additional recommended test equipment, software, power supply/supplies and accessories to ensure full functionality of the test rig(s) system.
o Modular integration of renewable energies test rigs where applicable.
o Each test rig frame panel should be width <1300mm, depth <800mm and height <2000mm.
o All relevant electrical and mechanical safety considerations built into the design.
o To be supplied with interactive/multimedia training course materials/operating instructions from the manufacture.
o Be able to perform a range of experiments on the rig(s) including three-phase busbar, coupling, open-circuit transmission, circuit breaker overtime behaviours.
o Be able to perform a range of experiments on the rig(s) including complex loads, load monitoring and power consumption analysis - using a range of resistance, induction, and capacitance loads.
o Allow for the investigation of dynamically alternating loads, power generation and intelligent energy management.
o Allow for the investigations of three-phase transmission lines, cables, earth-fault compensation, power networks, load voltage regulation and protection overvoltage/undervoltage.
o Have a wind power plant facility which allows for synchronisation to the grid.
o Measuring instrumentation to be provided with various communication interfaces to allow for PC control from user input.
o Power Engineering software must be provided for the intelligent control and evaluation of smart grids, with necessary displays(s).
o Power Engineering software to allow for simulation work where appropriate.

The necessary software and any training manuals/exercises for students to complete when in the laboratory environment must be supplied in electronic format

The warranty period must be a minimum of one year.

Additional information:
Is a Recurrent Procurement Type? : No

Notices

  1. 19 Aug 2022 Tender notice

Contracts Finder holds the official notices, with their documents and contact details.

Data