Provision of a Smart Grid and Transmission Line Test Rig(s) for the University of Sunderland
University of Sunderland Active Tender notice
- Buyer
- University of Sunderland
- Procedure
- Open procedure (below threshold)
- Category
- Goods
- CPV code
38500000Checking and testing apparatus- First published
- 19 Aug 2022
- Last updated
- 19 Aug 2022
- Rules
- Before the Procurement Act 2023: the Public Contracts Regulations 2015 and earlier rules, or below their thresholds
Description
The School of Engineering at the University is looking to purchase a smart grid and transmission line test rig(s) setup which is suitable for:
o All test rig or rigs should come with both the necessary and additional recommended test equipment, software, power supply/supplies and accessories to ensure full functionality of the test rig(s) system.
o Modular integration of renewable energies test rigs where applicable.
o Each test rig frame panel should be width <1300mm, depth <800mm and height <2000mm.
o All relevant electrical and mechanical safety considerations built into the design.
o To be supplied with interactive/multimedia training course materials/operating instructions from the manufacture.
o Be able to perform a range of experiments on the rig(s) including three-phase busbar, coupling, open-circuit transmission, circuit breaker overtime behaviours.
o Be able to perform a range of experiments on the rig(s) including complex loads, load monitoring and power consumption analysis - using a range of resistance, induction, and capacitance loads.
o Allow for the investigation of dynamically alternating loads, power generation and intelligent energy management.
o Allow for the investigations of three-phase transmission lines, cables, earth-fault compensation, power networks, load voltage regulation and protection overvoltage/undervoltage.
o Have a wind power plant facility which allows for synchronisation to the grid.
o Measuring instrumentation to be provided with various communication interfaces to allow for PC control from user input.
o Power Engineering software must be provided for the intelligent control and evaluation of smart grids, with necessary displays(s).
o Power Engineering software to allow for simulation work where appropriate.
The necessary software and any training manuals/exercises for students to complete when in the laboratory environment must be supplied in electronic format
The warranty period must be a minimum of one year.
Additional information:
Is a Recurrent Procurement Type? : No
Notices
- 19 Aug 2022 Tender notice
Contracts Finder holds the official notices, with their documents and contact details.