Description

The Plot 3 Infrastructure works around Temple Quay being approximately 3,000m2 of pavement
construction, generally comprise of stone capping with tarmac sub-base, sand and block paving, and
"Earthworks associated works will include the following components:
o Earthworks
Extension of Friary to Meads Reach Bridge
o This work would comprise the extension of Friary as a two carriageway road east of Isambard
Walk to Meads Reach Bridge. Access to the extended Friary would be controlled for service vehicles
only through the provision of bollards.
o As part of this work the footway to the north of Friary (adjacent to the Plot 3 development
site) would be extended to 6 metres in width, as will the footway to the south (adjacent to the station)
would be made 8.5 metres in width and include the provision of 6 new benches and an avenue of 5
new trees.
o A visitor drop off area is also proposed adjacent to the potential Conference Centre entrance
at Plot 3
Flexible Public Space
o Space for temporary use will also be provided between the extended Friary and the Grade 1
listed retaining wall off the Goods Shed, any proposals for temporary use of this area would be
subject to a separate application
o The area will be finished with seating terraces, and a planted bank to tie into the existing
levels.
o This area will also need to be made capable of accommodating the occasional vehicle turning.
Opening Isambard Walk as a two-way vehicular street between Friary and Temple Back
East
o The existing pedestrianised Isambard Walk will be opened for two-way vehicle access to
create a link between Temple Back East and Friary, and to tie in with the existing road of the private
estate, a new footway will also be provided to the eastern side of the Isambard Walk new
carriageway.
o Isambard Walk will act as a shared space, and be treated to reduce the potential dominance
of vehicles and reduce vehicle speeds
o The footway, trees, cycle parking and street furniture to the west of Isambard Walk and in
The Square would remain as existing.
Temple Back East
o The existing turning head area on Temple Back East would be removed, to allow two way
vehicular access to Isambard Walk
o Two way vehicular access will be maintained to Rope Walk, with a left turn out of Rope Walk
into Isambard Walk to be provided for
o Existing crossing will be maintained across from The Square to the footway on Temple Back
East

Additional information: Indicative timescales for the programme of works are as follows:
Current Opportunity Notice published: 06/01/2016
Deadline for Tender Submissions: 10/02/2016 13:00
Notification of intention to award contract: 17/02/2016
Contracts awarded and signed: 18/02/2016 – 03/03/2016
Commencement: 21/03/2016
We are not seeking any expression of interest in relation to this Early Engagement
Notice

Notices

  1. 18 Nov 2016 Planned procurement

Contracts Finder holds the official notices, with their documents and contact details.

Data