Plot 3, Infrastructure Works, Temple Quay
Homes & Communities Agency Cancelled Planned procurement
- Buyer
- Homes & Communities Agency
- CPV code
45200000Works for complete or part construction and civil engineering work- First published
- 18 Nov 2016
- Last updated
- 18 Nov 2016
- Rules
- Before the Procurement Act 2023: the Public Contracts Regulations 2015 and earlier rules, or below their thresholds
Description
The Plot 3 Infrastructure works around Temple Quay being approximately 3,000m2 of pavement
construction, generally comprise of stone capping with tarmac sub-base, sand and block paving, and
"Earthworks associated works will include the following components:
o Earthworks
Extension of Friary to Meads Reach Bridge
o This work would comprise the extension of Friary as a two carriageway road east of Isambard
Walk to Meads Reach Bridge. Access to the extended Friary would be controlled for service vehicles
only through the provision of bollards.
o As part of this work the footway to the north of Friary (adjacent to the Plot 3 development
site) would be extended to 6 metres in width, as will the footway to the south (adjacent to the station)
would be made 8.5 metres in width and include the provision of 6 new benches and an avenue of 5
new trees.
o A visitor drop off area is also proposed adjacent to the potential Conference Centre entrance
at Plot 3
Flexible Public Space
o Space for temporary use will also be provided between the extended Friary and the Grade 1
listed retaining wall off the Goods Shed, any proposals for temporary use of this area would be
subject to a separate application
o The area will be finished with seating terraces, and a planted bank to tie into the existing
levels.
o This area will also need to be made capable of accommodating the occasional vehicle turning.
Opening Isambard Walk as a two-way vehicular street between Friary and Temple Back
East
o The existing pedestrianised Isambard Walk will be opened for two-way vehicle access to
create a link between Temple Back East and Friary, and to tie in with the existing road of the private
estate, a new footway will also be provided to the eastern side of the Isambard Walk new
carriageway.
o Isambard Walk will act as a shared space, and be treated to reduce the potential dominance
of vehicles and reduce vehicle speeds
o The footway, trees, cycle parking and street furniture to the west of Isambard Walk and in
The Square would remain as existing.
Temple Back East
o The existing turning head area on Temple Back East would be removed, to allow two way
vehicular access to Isambard Walk
o Two way vehicular access will be maintained to Rope Walk, with a left turn out of Rope Walk
into Isambard Walk to be provided for
o Existing crossing will be maintained across from The Square to the footway on Temple Back
East
Additional information: Indicative timescales for the programme of works are as follows:
Current Opportunity Notice published: 06/01/2016
Deadline for Tender Submissions: 10/02/2016 13:00
Notification of intention to award contract: 17/02/2016
Contracts awarded and signed: 18/02/2016 – 03/03/2016
Commencement: 21/03/2016
We are not seeking any expression of interest in relation to this Early Engagement
Notice
Notices
- 18 Nov 2016 Planned procurement
Contracts Finder holds the official notices, with their documents and contact details.