Peasholme Glen Bridge Deck Strengthening and Concrete Repair Works
North Yorkshire County Council Complete Contract award
- Buyer
- North Yorkshire County Council
- Estimated value
- £425,000 as published; Contracts Finder does not say whether VAT is included
- Awarded value
- £378,127 as published, VAT not stated
- Procedure
- Restricted procedure
- Category
- Services
- CPV code
45000000Construction work- First published
- 16 Dec 2015
- Last updated
- 16 Dec 2015
- Rules
- Before the Procurement Act 2023: the Public Contracts Regulations 2015 and earlier rules, or below their thresholds
Description
NYCC seeking a contractor for the Peasholm Glen Bridge strengthening and concrete repairs. This is to be tendered through YorCivils Framework Contract, Lot 3.
Additional information: The Council require a suitable Contractor to carry out works to Peasholm Glen
Bridge.
The Works Briefly comprises:-
* Vegetation clearance around the bridge abutments and the proposed
site cabin locations.
* Design and Erect scaffolding system for safe access to all the work
areas underneath the bridge deck, as well as pilasters on both abutment sides.
* Carry out hammer tapping and sound tests to underside of the bridge
deck to remove any delaminated concrete.
* Remove the delaminated concrete around the corroded rebar areas using
non-destructive methods such as Saw or Disc cutting or similarly approved until
the non-corroded steel length reached to hand place or spray the new concrete
repair mortar or micro concrete in to voids.
* Break the concrete up to 50 to 70mm to place the repairing mortar.
* Clean and prepare all the exposed rebar's to take a primer coating to
protect any further corrosion, replace the badly corroded rebars with similar
diameter of reinforcement with a minimum lap length of 40Xbar diameter.
* Fill all concrete breaks out and repair areas with FOSROC or Sika
type of repairing mortar by hand placing or spraying.
* Apply a final anti-carbonation coating on to the exposed bridge sofit
and rib areas [Not for the bays with the FRP material] to protect the concrete
surfaces for future carbonation induced corrosion or chloride induced
delamination.
* Design and Apply FRP (Fibre reinforced Polymers) bridge strengthening
material to the existing bridge deck as shown in Drawing Number NYCC/982/004 to
achieve a minimum resisting Bending Moment of 50kN.m (Existing) to 98.54kN.m
(Proposed).
* Repointing of dislocated stone copings on both sides of the bridge
parapets.
The proposed form of contract is NEC3 Option A. It is anticipated that the
Tender documents will be released within the next few weeks with a return date
of mid-Nov 2015. It is envisaged the works will commence towards the beginning
of February 2016 with an estimated Programme duration of 16 weeks.
Awards
| Supplier | Value | Date | Status |
|---|---|---|---|
| PBS Construction (North East) Ltd | £378,127 | 26 Nov 2015 | Active |
Notices
- 16 Dec 2015 Contract award
Contracts Finder holds the official notices, with their documents and contact details.