# Palladium Permeators and Palladium Membrane Reactors

Mercell UK Ltd · Active · Tender amendment

- Buyer: Mercell UK Ltd
- Procedure: Other - Other
- Category: Services
- CPV code: 71323000 Engineering-design services for industrial process and production
- First published: 22 October 2024
- Last updated: 22 November 2024
- Rules: before the Procurement Act 2023 (published on Contracts Finder)

## Description

UKAEA wishes to procure the Design, analysis, manufacture, assembly, Factory Acceptance Testing, delivery, Site Acceptance Testing, plus support during the installation, Integrated Testing, and commissioning of 3-off palladium-silver permeators, 2-off palladium-silver membrane reactors, three-off recuperative heat exchangers, and four cooling coils for the Hydrogen Purification System to be supplied into the Hydrogen 3 Advanced Technology facility at UKAEA's Culham Science Centre. The requirement also includes the sourcing of one steam generator and one dosing pump for providing water vapour into the PMR, including detailed design of the associated lines and process equipment.
Designs are to be manufactured by the Contractor and must support and contain the process equipment whilst providing external process and Electrical, Control and Instrumentation (EC&I) connections.
The manufacturing, testing and delivery includes assembling all the process equipment fabricated/procured by the Contractor into completed permeators and PMRs for future installation by others into Gloveboxes. The Contractor/Supplier must undertake Factory Acceptance Testing to demonstrate the functionality of the permeator and PMR assemblies. Dedicated design reviews, and a full review of all design documentation shall be conducted by the Office of Chief Engineers (OCE) prior to any production to ensure the permeator and PMR assemblies meet the UKAEA requirements listed within the Tender pack. The Contractor/Supplier shall deliver the permeators and PMRs to Culham and complete Site Acceptance Testing, after which a third party will conduct the Installation, Integrated Testing, and commissioning with support from the Contractor/Supplier. Sufficient information shall be provided for inclusion within the technical file (LTQR) to support the overall conformity marking of the system.

The estimated duration of design, manufacturing, testing, and delivery is 22 months.

## Notices

- 22 Oct 2024: Tender notice https://www.contractsfinder.service.gov.uk/Notice/f0f57ed0-7fa9-4731-8ff2-3e5ae41c4aa2
- 22 Nov 2024: Tender amendment https://www.contractsfinder.service.gov.uk/Notice/f0f57ed0-7fa9-4731-8ff2-3e5ae41c4aa2

---
Page: https://opencontracts.uk/contract/palladium-permeators-and-palladium-membrane-reactors-9e3787fd-4826-4169-b309-56f93edb284a
Contains public sector information licensed under the Open Government Licence v3.0. Source: Find a Tender and Contracts Finder, Cabinet Office.