Package 1 Demolition, Boiler & ancillary equipment removal (Dungeness)

Nuclear Restoration Services Limited Complete Contract award

Buyer
Nuclear Restoration Services Limited
Estimated value
£90,100,000 as published; Contracts Finder does not say whether VAT is included
Awarded value
£190,600,000 as published, VAT not stated
Procedure
Competitive procedure with negotiation (above threshold)
Category
Works
CPV code
42418000 Lifting, handling, loading or unloading machinery
First published
10 Nov 2026
Last updated
10 Nov 2026
Rules
Before the Procurement Act 2023: the Public Contracts Regulations 2015 and earlier rules, or below their thresholds

Description

Dungeness 'A' is a redundant nuclear power station located on the Romney Marsh in Kent. The power station ceased generation in 2006 and is currently undergoing decommissioning.

The scope of works is for the Contractor to undertake the role of "Principal Contractor" for the safe removal of all hazards including Asbestos Containing Materials (ACM's), soft stripping internal fixtures, fittings & linings and removal of the Boilers, by pass ducts, main gas duct sections, suitable laydown and weatherproof storage. The safe demolition of the buildings adjoining the east and west faces of the reactor buildings of the Dungeness A Site, noting the Blower Halls and Central Control Block are reduced to slab level with other buildings reduced as stated in the scope of works and in accordance with BS6187:2011 Code of Practice for Full and Partial Demolition (Ref. 16.4.1).

To provide some idea of scale, Dungeness has eight boilers which will require removal and laydown. These are estimated at 7m in diameter and 21m long, they weigh approximately 700 tonnes each. Approximately 30% of the building structures currently on Site will be removed by the contract.

The Client will apply for any necessary planning permissions and carry out any activities necessary to obtain the Planning Approval. The Contractor is to provide all management, documentation, labour, plant, equipment, and materials to remove the hazards, de-plant all equipment, lifting and removal of the Boilers, by pass ducts, main gas duct sections, suitable laydown and weatherproof storage, demolition of the buildings and make good weatherproof of remaining structures including site remediation.

The scope of this project includes the preparation and execution of all necessary investigation work such as ground, geological, ordnance, camera, flow surveys, etc. necessary to complete the scope of works.

Awards

SupplierValueDateStatus
Aureos Highways Limited £190,600,000 23 Oct 2026 Active