OpenContracts

Mottram Road Retaining Wall (633N) Refurbishment and Associated Work Scheme 2017

Tameside Metropolitan Borough Council Active Tender notice

Buyer
Tameside Metropolitan Borough Council
Estimated value
£220,000 as published; Contracts Finder does not say whether VAT is included
Procedure
Open procedure
Category
Works
CPV code
44000000 Construction structures and materials; auxiliary products to construction (except electric apparatus)
First published
12 Jan 2017
Last updated
12 Jan 2017
Rules
Before the Procurement Act 2023: the Public Contracts Regulations 2015 and earlier rules, or below their thresholds

Description

Site 1 - Mottram Road Retaining Wall (633N) Mottram Road Retaining Wall (633N) is a 154m long masonry wall that acts as a boundary wall between the A57 Mottram Road and an adjacent vegetated embankment on the bank of Godley Brook. The land behind the wall is owned by Tameside MBC. The work is to ideally be undertaken before March 2017 to avoid the bird nesting season from November to March inclusive. Site 2 - Walkerfold Culvert (015) Walkerfold Culvert carries Werneth Brook from south to north beneath Mottram road A57 Hyde. The culvert comprises three types of construction, from the inlet; Ch 0 -16.825m comprises a 900mm Circular Brick Culvert, Ch.16.825-61.35m comprises a brick arch culvert of varying dimensions, Ch. 61.35m - 67m comprises stone slabs. The culvert has a formed stone invert throughout its length. A CCTV investigation has noted several areas of flattening of the arch section, including beneath the carriageway

Notices

  1. 12 Jan 2017 Tender notice

Contracts Finder holds the official notices, with their documents and contact details.

Data